3. Civil work
Note:
The details below are for each of the base product cabinet.
For most installations, some form of civil work will be needed.
It is the responsibility of all parties working on the project to ensure the civil, mechanical, and
electrical works are executed in compliance with the, local and national codes, standards, rules
and regulations.
It is the sole responsibility of the site owner, to make sure:
•
the civil works are executed in compliance with the, local and (inter) national Directives,
Standards, Rules and Regulations;
•
the AC cable is protected against the ground water;
•
the DC cable is routed in its own duct and protected against ground water;
•
the PE and CP (optional signal) cable, AC auxiliary cable are routed in their own duct and
protected against ground water;
•
the cable ducts are buried at least 50 cm apart, or routed in EMC shielded cable trays.
Danger:
Failing to adhere to these points may result in a variety of consequences from
damaged equipment to personal harm or death.
Note:
Al cable ducts must be protected for ingress of water. An underground cable duct
does protect of ground water, however if open at surface level, then also rain or sea
water might flood into the duct, worsening the electric behavior and can cause
situation in which the charger goes over to a malfunction state.