16
3
4
5
6
7
8
9
10
11
12
13
Open the undersurface zips (next to the centre
of the kite)
Pull the ISL line out from the plastic ring.
Connect the ISL line end to the internal knot using a larks
head connection.
Wind and pack the ISL line into the pocket on the rib (profile section). Ensure the line has enough slack as it runs
towards the tips. If there is too much tension it will prevent the kite from flying.
Close the zip
Repeat process for the other side.
Open the Leading Edge air intake velcro to access valve.
Undo the four velcro retainers and unroll the valve.
Push the valve back into the kite.
Reach inside the valve and attach the ends of the valve
sock to the velcro retainer on the rib left and right sides.
Close the Leading Edge air intake velcro.
Summary of Contents for Hyperlink V3
Page 1: ...1 Hyperlink V3 Manual ...
Page 24: ......