VZR.247800.001
IM
Turnstile CUBE C-03
Installation Manual
19
TO CONNECT THE TURNSTILE USING THE POWER CABLE WITH THE
SECTION OF LESS THAN 1.5 MM
2
WHEN THE LENGTH OF THE SUPPLY
CABLE IS MORE THAN 10 M
– IT IS RECOMMENDED TO USE THE CABLE
WITH THE CROSS-SECTION OF 2.5 MM
2
.
ATTENTION:
IT IS NOT RECOMMENDED TO INSTALL POWER SUPPLY
UNIT AT A DISTANCE OF MORE THAN 25 M FROM THE TURNSTILE.
The turnstile is powered by 12 V DC power supply. The maximum
consumption is 1.5 A. The PSU should be selected based on these parameters.
It should also be taken into account that voltage drop increases when the
supply cable length is increased (operating voltage range is detailed in the
Operation Manual VZR.247800.001 (OM)).
Install the PSU in the place providing easy operator access.
Connect the PSU cable to +12U and GND POWER contact group on the
control board.
Make sure that the cable is securely connected.
The POWER block has additional power supply terminals for connecting an
external controller.