Regudis W-HTE
Installation
1
2
Fig. 25: Wall attachment of the ball valve connection
set
1
Drill holes
2
Carrier rail
Observe the separate instructions for the ball
valve connection set.
1
Have suitable fixing material ready.
2
Position the ball valve connection set horizontally on
the wall.
3
Mark the drill holes (1) through the holes in the carrier
rail (2).
4
Drill holes in the wall at the markings and insert
dowels.
5
Align the ball valve connection set horizontally on the
wall and screw it into the dowels with screws and
washers.
6
Close all ball valves.
7
Connect the pipework to the ball valves.
Z
The ball valve connector block is attached to the wall.
6.4.1 Wall attachment of the station
1
2
Fig. 26: Alignment and marking of the station
1
Holes
2
Station
1
Have suitable fixing material ready.
2
Lift the station (2) onto the ball valve connections and
position the station horizontally on the wall.
3
Mark the drill holes through the holes (1) of the rear
insulation shell and the angled wall bracket ((3) and (2)
in Fig. 3 on page 11).
4
Lift the station from the wall.
1
2
3
4
Fig. 27: Wall attachment of the station
1
Dowels
2
Washers
3
Screws
4
Station
5
Drill holes in the wall at the markings and insert
dowels (1).
Make sure that no dirt gets into the ball valve
connection set.
6
Lift the station (4) onto the ball valve connections.
7
Align the station horizontally on the wall and screw the
station into the dowels with the screws (3) and the
washers (2) through the holes in the rear insulation
shell and angled wall bracket.
Z
The station is attached to the wall.
25
134403082-V09.03.2022
Summary of Contents for Regudis W-HTE
Page 1: ...Regudis W HTE Produktabbildung Operating instructions EN ...
Page 2: ......
Page 6: ......
Page 64: ...Regudis W HTE Appendix 12 7 EU Declaration of conformity 64 134403082 V09 03 2022 ...
Page 65: ...Regudis W HTE 65 134403082 V09 03 2022 ...
Page 66: ...Regudis W HTE 66 134403082 V09 03 2022 ...
Page 67: ......