background image

20

4.3 Installation field

With  plain  tile  roofs,  keep  existing  roof  battens  as  support  and  fix  the  additionally  required  battens  according  to  the  dimensional

specifications. Coverings without lathwork (roof slates etc.), fix collector brackets and all other components directly onto the base.

If possible, define installation field so that the distance between one side of the collectors and the lateral roof covering is approximately 35

mm. Cut tiles (roof slates) to size for the opposite side. With large roof coverings it is recommended to take the mean of the collector field.

Installation dimensions [mm]

Number of collectors

Width of collector field

Width of installation field A

1 collector

1,160

1,230

2 collectors

2,325

2,395

3 collectors

3,490

3,560

4 collectors

4,655

4,725

5 collectors

5,820

5,890

Dimensions for installation field and location of battens. Use battens of the same thickness as the existing ones.
Additionally required battens are marked grey (5 pieces); length of battens = A (width installation field)
Outer dimensions of collector (L x W) = 1,930 x 1,160.

Summary of Contents for OKF Series

Page 1: ...8 1 General information 1 1 Information regarding operating instructions These installation instructions give important advice as to the han dling of the collectors The observance of all mentioned saf...

Page 2: ...ing system Or country specific rules and regulations Further information on the internet www oventrop de www bdh koeln de 2 5 Important standards rules and EC directives for the installation of solar...

Page 3: ...ion caps from the connections as soon as the collector is exposed to sunlight Risk of melting Collectors must not be installed with the protective foil Regulations for prevention of accidents during w...

Page 4: ...on nipple G 1 2 M x 18 mm solder tailpipe 2 4 Collector coupling hose 1 5 Cellular rubber sealing tape 2 6 Foam rubber sealing tape wedge shaped 2 7 Collector bracket top 4 8 Metal side sheet 26 9 Sil...

Page 5: ...heet metal cover top 1 2 Wooden support 1 3 Collector coupling hose 1 4 Foam rubber sealing tape wedge shaped 1 5 Cellular rubber sealing tape 1 6 Collector bracket top 2 7 Silicone T profile 1 8 Meta...

Page 6: ...mm Cut tiles roof slates to size for the opposite side With large roof coverings it is recommended to take the mean of the collector field Installation dimensions mm Number of collectors Width of col...

Page 7: ...9 Abb 5 Indachmontage L ngsschnitt A V Longitudinal section roof integration 6 1 2 3 4 5 Roof integration longitudinal section upper drawing and cross section lower drawing 1 Roof batten 2 Counter lat...

Page 8: ...dity will escape sideways 1 Align lower collector bracket with the roof batten and fix centrally between two collectors and laterally at the edge of the collector field 2 Insert collectors approx dist...

Page 9: ...carrying out leakage test Insert solar sensor into the sleeve Close opening with the help of the rubber plug which is slipped onto the cable Feed cable into the roof Line up the wooden support against...

Page 10: ...ndividual metal side sheets onto the battens with clout nails Insert metal sheets into the lower groove and align with the upper edge of the upper batten Starting from the bottom to the top mount meta...

Page 11: ...eets with each other by interlocking them at the rebate points and fix with dorsal gusset plate Position upper metal closing sheet so as to fit groove into the col lector rebate Nail upper metal closi...

Page 12: ...26 In areas prone to storm secure metal cover sheets by fixing them with 2 additional plumber sealing screws Completed OKF integration plain tiled roof 25...

Page 13: ...efficient 5 Transmission 96 Collector tilt angle for roof integration Degree 27 85 Permissible pressure suction load N m2 2250 Stagnation temperature at 1000 W m and 30 C C ca 208 Max permissible work...

Page 14: ...iber Schiefer_MA 091012 1WA10019 Solarf hler S V Solar sensor Solar sensor Solar sensor Solar sensor For an overview of our global presence visit www oventrop com Subject to technical modifications 13...

Reviews: