Do Not Attach Walls To
Floor until Step 27.
17.
Position rear solid wall into
place on plywood floor. Butt
both vertical wall studs of side
and rear walls together and
attach with 3- 2 1/2” screws.
Screw at the bottom, middle
and top of stud to secure
properly.
Rear
W
all
Panels
Rear
Solid
Wall
Side
Solid
W
all
18.
With the corner wall
attachment complete, position
rear wall so bottom 2x3 wall
framing is sitting flush with
outside floor joists and
plywood floor. Wall siding
should overhang floor by
approximately 1/2”
When positioned correctly,
add a second rear wall panel
and attach both rear wall
panel studs together as per
Step 17
.
Rear
Solid
W
all
2x3 wall framing flush
with outside of plywood.
Be sure that rear
wall panels fit
between the side
wall panels
(sandwiched)
Side W
all Panel
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
Optional
- Caulking
seams will help prevent
moisture from entering at
seam.
Caulking not included in
kit.