First position the 1
st
row of the jacket parts
dry on the fibre pads in the base frame.
The first row is only bonded at the front sides
towards each other using bedding mortar HK.
Now press the bottom clamping strip against
the jacket bricks and secure these with the
screws.
Now align the 1
st
row horizontally and
vertically.
Then place the remaining jacket parts
together on top of each other with bedding
mortar HK (joint thickness approx. 3 mm). Be
careful not to close off or contaminate the
inlet air gap on the base frame with bedding
mortar HK.
Before you brick up with the jacket bricks
above the door, this must be aligned at a
right angle with the base plate using the
lateral clamping strips and securedwith
screws.
(If this is not done, then problems may arise
later on when inserting the masonry heater
bricks.)