General information

 

 

 

Neither combustible nor explosive substances may be located in the installation space of the stove. 

 

 

The SE11 56/56/42 may not be installed in spaces with insufficient combustion air supply. (CAUTION: Please 
note  that  newly  constructed  or  renovated  buildings  can  be  very  airtight  and  as  a  result,  a  sufficient 
combustion air supply may not be possible without additional equipment.) A sufficient dimensioning of the 
supply lines must be ensured in the event of external combustion air supply. 

 Calculation required. 

 

 

Air  grates  for  the  combustion  air  supply  must  be  arranged  in  such  a  manner  that  they  cannot  be  easily 
blocked off. 

 

 

The  SE11  56/56/42  may  not  be  operated  in  installation  spaces  that  are  ventilated  by  means  of  fans  in 
ventilation or heating air systems with the exception that the safe operation of the stove can be ensured. 
This means: 

-

 

A simultaneous operation of an air extraction system and the firing installation must be prevented.  

-

 

The  negative  pressure  in  the  installation  space  must  be  prevented  automatically  and  reliably  by 
means of corresponding safety equipment  

-

 

Overall,  the  negative  pressure  generated  as  a result  of  the  combustion  air  flow  of  the  tiled  stove 
heating operation and the volume flows of the ventilation systems in the installation space and the 
rooms  connected  via  the  ventilation  system  may  not  exceed  a  value  of  4 Pa.  This  must  also  be 
ensured  in  the  event  of  the  adjustment  or  removal  of  easily  accessible  control  devices  of  the 
ventilation system (external air connection required). 

-

 

The system may only circulate the air within a room. 

 

 

No combustible objects may be located at a distance of 80 cm to the firebox door (radiation range). 

 

 

Attention must be paid in regard to the installation surface that no combustible materials are located to the 
side or behind the stove at a distance of 20 cm. Additionally, the ground must have sufficient loading capacity 
and must be incombustible.  

 

 

The installation of firing installations is only permitted at those locations in which a sufficient loading capacity 
of the installation surface is ensured and the installation surface may not be combustible. Should this not be 
the  case,  then  additional  measures  must  be  taken  to  achieve  this  (e.g.  incombustible  board  for  the 
distribution of the load). 

 

 

In  regard  to  the  covering  of  the  stove,  attention  must  be  paid  that  corresponding  cleaning  openings  are 
provided. The regular cleaning of the chimney may only be performed by a licensed specialist. 

 

 

Furthermore, attention  must be paid during the construction  of the covering that components such as the 
control,  temperature  sensor,  air  damper  and  actuator  are  accessible  at  all  times.  The  wiring  of  the  door 
contact switch and temperature sensor must be implemented in a removable manner.  

 

 

This firing installation is suitable for multiple connections to the chimney, however, the self-closing function 
of the firebox door must be active (springs in the door frame must be tensioned). 

 

 

The construction and dimensions of the ceramic hot gas flue may be designed in an individual manner.  
The design of the ceramic hot gas flues must be performed for the Ortner KMS using the Ortner calculation 
programme  (storage  mass  of  the  ceramic  hot  gas  flue  approx.  520 kg,  will  significantly  affect  the  assembly 
situation), and for the construction of chamotte flues in accordance with the technical directive on stove and 
air heating construction (applies to Germany) or the tiled stove calculation programme (EN 15544). 

 

 

CAUTION:  The  ceramic  disc  can  fracture  during  operation  due  to  a  mechanical  overload,  this  will  result  in 
sharp parts (risk of injury). 

Summary of Contents for SE11 56/56/42

Page 1: ...ided calculation is required Use caution in regard to the utilisation of ventilation systems fume hoods etc To avoid any errors please first carefully read our assembly instructions The respective national or local regulations and general provisions stipulations and codes of practice must be complied with CAUTION Due to the thermal expansion of the door unit a space of at least 4 mm must be provid...

Page 2: ...1 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at ...

Page 3: ...f the Ortner storage corner 3 Technical specifications 3 Important information before the installation 4 Initial steps 5 Outlet on side or behind 5 Outlet on top 6 Technical dimensioned drawing 12 General information 12 Fire and heat protection 14 General 14 Mounting surfaces TO BE PROTECTED 14 Mounting surfaces NOT TO BE PROTECTED 14 General 15 Schematic sketch 16 Exploded view 18 ...

Page 4: ...gree of efficiency 80 Stack gas mass flow 52 g s Minimum distance to adjacent combustible substances when installed freestanding front 100 cm side 20 cm rear 20 cm Pipe connection temperature upstream of the ceramic post heating surface 517 C Mean exhaust temperature downstream of the ceramic storage unit KMS 300 125 C Mean required discharge pressure with rated heat output 14 Pa When used with th...

Page 5: ...s function and ease of operation Check all screws on the frame and retighten if necessary Shell components red must always be made gastight with Ortner bedding mortar HK Depending on the specific burn out situation certain shell components must be cut to length accordingly Refractory concrete parts grey are always installed dry no bonding In this manner they can always be replaced via the door All...

Page 6: ...l 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Initial steps Outlet on side or behind The outlet brick GOA 1 is always located in the top 3 rows GOA 1 Adapt the jacket bricks GOA 1 Adapt the jacket bricks Label inside GO11a 2 GO13a ...

Page 7: ...he provided fibre strips on the connection points between metal and ceramic Set up the base frame level the bottom part and if necessary connect the aluminium flexible hose for the combustion air supply Loosen the screws of the metal strips on the frame contact surface with jacket components and on the tabs on the base frame Loosen the screws ...

Page 8: ...ntally and vertically Then place the remaining jacket parts together on top of each other with bedding mortar HK joint thickness approx 3 mm Be careful not to close off or contaminate the inlet air gap on the base frame with bedding mortar HK Before you brick up with the jacket bricks above the door this must be aligned at a right angle with the base plate using the lateral clamping strips and sec...

Page 9: ...ortner cc at www ortner cc at Place the base plates and the ash bricks in the combustion chamber do not bond Insert the first two rows of GOS in the combustion chamber No bond is created in the course of this The designation of the bricks relates to the number of segments GOS8 GOS8 GOS7 GOS7 ...

Page 10: ... bricks the joints must be sealed with ceramic fibre However the parts of the post combustion chamber should not be bonded with each other Now install the remaining rows of the GOS In the course of this in places a 6 mm air gap must be created between the bricks Caution The GOS without nubs must be placed in the top row Joint pattern GOS An OPEN joint must be created after the 2nd and 4th row GOS ...

Page 11: ... Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Position the deflection plate on the GOS and always slide this to the very back and to the side of the burn out Now position the cover of the post combustion chamber GO1 8 GO1 8 2 ...

Page 12: ...54 2708 office ortner cc at www ortner cc at Bond the cover of the jacket with the side parts Use ORTNER bedding mortar HK for this task Caution The minimum distance between the cover of the post combustion chamber and the jacket cover must be at least 12 mm GOA 13 GOA 14 GOA 5 ...

Page 13: ... ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Technical dimensioned drawing applies to both automatic as well as manual operation ...

Page 14: ...e of 80 cm to the firebox door radiation range Attention must be paid in regard to the installation surface that no combustible materials are located to the side or behind the stove at a distance of 20 cm Additionally the ground must have sufficient loading capacity and must be incombustible The installation of firing installations is only permitted at those locations in which a sufficient loading...

Page 15: ...tection must be implemented as follows Electrical installations and or electrical components on the side facing the stove Construction of the insulation just as the mounting surfaces TO BE PROTECTED Electrical installations and or electrical components on the rear of the mounting wall wall thickness greater than 12 5 cm and mounting wall detached at the rear Construction of the installation just l...

Page 16: ...the stove made of combustible materials then it must be protected with a coating made of incombustible material e g sheet metal from the firebox opening forwards at least 30 cm and at least 10 cm to the side 5 When containers drawers etc are to be integrated in the firing installation then it must be prevented that embers or burning material can fall into them from the firebox Furthermore temperat...

Page 17: ...16 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Schematic sketch ...

Page 18: ... when the covering is attached upwards to the ceiling then insulation is required The heat insulation can either be performed with the reference insulation material or a substitute insulation material In the event of a non insulated heating chamber ceiling the distance between the upper edge of the firebox and the heating chamber ceiling must be at least 10 cm 7 Covering 8 BIS bricks For the insul...

Page 19: ...18 ORTNER GmbH Hürmer Straße 36 in A 3382 Loosdorf Tel 43 2754 2707 Fax 43 2754 2708 office ortner cc at www ortner cc at Exploded view ...

Reviews: