11
ORTNER GmbH | Hürmer Straße 36 in A-3382 Loosdorf | Tel +43 2754 2707 | Fax +43 2754 2708
[email protected] | www.ortner-cc.at
Bond the cover of the jacket with the side
parts.
Use ORTNER bedding mortar HK for this task.
Caution: The minimum distance between the
cover of the post-combustion chamber and
the jacket cover must be at least 12 mm.
GOA.13
GOA.14
GOA.5