9
Before first startup it is necessary to:
- Check water level in installation, pressure in installation should be 2 bar.
- Check fire-grate location (fire-grate gaps from bottom should be bigger than from top).
-
Draft regulator seal with oakum and mount, fit arm and block with screw.
Startup:
- Mount draft regulator horizontally, regulator set on 70°C.
-
Open flue flap.
- Put on fire-grate papers and small wood pieces; open bottom door .
- After lightning up put bigger wood logs and create ember layer (close bottom door and
unscrew primary air flap – opening in flap at least 2cm- regulation knob is located on bottom
door.
- After creating ember layer fully load boiler with wood or coke. Put wood logs along
chamber.
- Set chimney draft with flue flap
- Connect draft regulator chain with primary air flap. Burn in boiler up to 70°C then set draft
regulator on 70°C and shorten chain till primary air flap is barely opened. Draft regulator knob
is for temperature change. Marking on regulator is every 10°C.
ATTENTION!
Before stoking boiler open slowly open upper door to suck out gases.
ATTENTION!
It is not allowed to open bottom door during boiler burning – glow may fall out.
SECONDARY AIR SETTINGS:
- wood opening ½
- coke opening ¼ .
Troubleshooting
Reason
Activity
Heat exchanger gets dirty to fast
Use good quality wood, moisture content 18-23%.
Smoke leakage
Seal chimney pipe, open more flue flap, check chimney draft
Too high temperature of exhaust
gases
Check fuel moisture content, cannot be too dry.
Check secondary air settings.
Too short burning period
To high exhaust gases temperature: burning period depends on
used fuel and heat demand
4. Boiler startup
Summary of Contents for ORLIGNO 100
Page 1: ...ORLIGNO 100 MANUAL AND SERVICE MANUAL...
Page 6: ...6 3 1 Dimensions 3 2 Boiler construction...
Page 7: ...7 3 3 Safety valve connection...
Page 12: ...12...
Page 23: ...23 Pic 5 Burner assembly Pic 6 Feeder assembly...
Page 24: ...5 4 Tank assembly 24...
Page 47: ...47...