MACHINE UNLOADING 

INSPECTION & INSTALLATION 

 
UNLOADING 

 
Machine can be easily unloaded and transported by a 
forklift with a minimum capacity of 2500 lbs. 
 
1. Carefully insert the forks into the lifting tubes to the 
maximum possible depth. Depending on the model, a 
forklift access may be either at the turntable end of the 
machine frame, the tower end or both. In case of the 
mongoose machine enter the forks under the frame or 
insert the forks in the tube brackets welded to the top of 
the machine. 
 
2. Lift the machine (or other part of system) only to the 
necessary height to move it with no bouncing or friction on 
the floor. 
  
3. Sit the machine down assuring uniform contact with the 
floor, which is necessary to ensure correct and smooth 
operation. 
 

INSPECTION 

 
1. Remove all packing and supporting additions - these 
may include the blocks under the carriage and the 
restraining bar over the table.

 

NOTE:  

when removing the stretchwrap film covering the 

machine, care must be taken not to cut any of the 
electrical wires and/ or polyurethane covering on the film 
carriage rollers. 
 
2. Perform a visual inspection of the electrical and 
mechanical parts for loosened joints and / or broken 
connections. Any suspected shipping damage must be 
reported immediately to the freight carrier. Any transport 
damage cannot be claimed to Orion Packaging Inc. Items 
that are vulnerable to damage and must be inspected are 
as follows: 
 

- Motors and transmissions 
- Junction boxes 
- Electrical conduits 
- Proximity and limit switches 
- Photocells 

 
3.  Check under the turntable to ensure that there is no 
crippling of the movable parts i.e. casters, center axle or 
drive assembly. 
 
4.Verify the following: 
 
- Turntable or rotary arm drive system to confirm that the 
reducer to drive the chain is snug and properly aligned. 
 
- Verify the wires tight conduits for crushed sections or 
loose fittings. 
 

 
 
- Verify the film carriage to be sure that it is correctly 
aligned with the tower 
- Verify the tension on the lift chain. 
- Verify all the dials and knobs on the control panel for 
smooth action. 

 
MACHINE INSTALLATION 

 
After the visual inspection has been completed, the 
electrical power and the compressed air shall be 
connected as specified on the diagrams supplied with the 
machine. An electrical diagram is provided with each 
machine in the envelope attached to the panel box. 
 

ASSEMBLY PROCEDURE 
 

The structural frames of the machine have to be installed 
on a leveled floor. Locate the main wrapper section into its 
final position, keeping the tower assembly* away from any 
traffic. The wrapper mainframe section 

must be bolted to 

the floor by the 1/2” concrete floor anchors

 (leg & 

shield or expandable type). 
 
Any wiring that has been disconnected to facilitate 
transport is marked with a number located on the junction 
box to which the wiring must be reconnected. Any wire run 
that appears too short or long may indicate that the 
position of the mechanical components is incorrect. Verify 
the status of all assemblies before proceeding. 
 
* The tower deviation from vertical must not exceed 1/4” 
on the distance of 10 feet (angle: 0 degrees 6’). 
 

The roping bar 
 

The roping bar is rotating around the shoulder screw (dwg 
M-435381 item # 7) and his height can be adjusted from 0 
to 6 inches from the base. That device is squeezing a 
stripe from 0 to 6 inches of the film like a rope to stabilize 
the load itself or attach it on the pallet. To adjust the 
roping bar you need a ½” wrench and you have to loose 
up the screw #5 and #6. 
 

Getting started (Security tip)  
Be careful to never walk on the turntable it could 
cause you an injury. 
 

Put a pallet on the turntable and attach the end of film 
around the load on the same side than the control panel. 
Put the carriage at the bottom end of the tower to begin a 
cycle of wrapping. After the start don’t stay to close and 
wait until the end of the cycle. After the cycle, cut the film 
and remove the load. The carriage is returned back to the 
bottom of the tower and ready to wrap again. 
 

Summary of Contents for 2007-8899999

Page 1: ...MODEL SPECTRA HP v 20 SERIAL 2007 8899999 2270 Industrial boul Montreal Laval Canada H7S 1P9 Tel 450 667 9769 Fax 450 667 6320...

Page 2: ...2 INSTRUCTION MANUAL FOR ALL INQUIRIES PLEASE CONTACT OUR LOCAL DISTRIBUTOR FOR NORTH AMERICA ONLY 1 800 333 6556...

Page 3: ...ance procedures will guarantee a long and productive life of the equipment Notice Our manual covers standard features of the machine Certain options may not be fully covered due to their unique applic...

Page 4: ...cle Pause for Stopping the Wrap Cycle Without Resetting Film Stretch Delivery Uses standard 20 film rolls InstaThread for ultra fast drop in film threading 260 Standard film stretch available from 100...

Page 5: ...o be sure that it is correctly aligned with the tower Verify the tension on the lift chain Verify all the dials and knobs on the control panel for smooth action MACHINE INSTALLATION After the visual i...

Page 6: ...6...

Page 7: ...7 Note For VFD adjustment please contact Orion Packaging service department...

Page 8: ...8...

Page 9: ...of wraps on top of the load 2 BOTTOM WRAPS 1 2 3 9 Press button 2 on the keypad to select Bottom Wrap then using the arrows on the keyboard select between 1 to 9 for required number of wraps at the bo...

Page 10: ...held down when released the turntable will stop 8 TABLE SPEED The option has two setting fix or adjustable When set to fix the turntable speed is constant and can not be change by the knob knob is in...

Page 11: ...by pushing bar marked PUSH TO CLOSE 8 When the film feeding is completed fig 2 turn the power switch on 9 Peel off the first few winds of the film multistrech will run due to displacement of the dance...

Page 12: ...the carriage cover Unbolt the two nuts holding the proximity switch item 1 Turn the Proximity sensor item 2 to create the gap between the cam and the front side of proximity sensor about 1 8 Tighten o...

Page 13: ...The re lubrication interval suggested for these bearings used in Stretch Wrapping Machinery is 750 hours with a maximum period of 6 months The lubricant should be fresh and applied in sufficient quant...

Page 14: ...14 SEMI AUTOMATIC STANDARD ASSEMBLY PART LIST Note Quantity listed in order of part number The names given to the parts are generic...

Page 15: ...15...

Page 16: ...16...

Page 17: ...17...

Page 18: ...18...

Page 19: ...19...

Page 20: ...20...

Page 21: ...21...

Page 22: ...22...

Page 23: ...23...

Page 24: ...24...

Page 25: ...25...

Page 26: ...26...

Reviews: