MACHINE INSTALLATION
After the visual inspection has been completed, the electrical power and the compressed air
shall be connected as specified on the diagrams supplied with the machine. An electrical
diagram is provided with each machine in the envelope attached to the panel box.
ASSEMBLY PROCEDURE
The structural frames of the machine have to be installed on a leveled floor. Locate the main
wrapper section into its final position, keeping the tower assembly* away from any traffic.
The wrapper mainframe section
must be bolted to the floor by the 1/2” concrete floor
anchors
(leg & shield or expandable type).
NOTE: Mongoose M66IS or M67IS the “Z” stand must be bolted to the
floor by 5/8” anchors bolt or stronger anchors.
Any wiring that has been disconnected to facilitate transport is marked with a number
located on the junction box to which the wiring must be reconnected. Any wire run that
appears too short or long may indicate that the position of the mechanical components is
incorrect. Verify the status of all assemblies before proceeding.
* The tower deviation from vertical must not exceed 1/4” on the distance of 10 feet (angle: 0
degrees 6’).