Orenco Systems
®
• 800-348-9843 • +1 541-459-4449 • www.orenco.com
NIM-EPS-1
Rev. 6 © 10/21
Page 6
Biotube ProPak and LOS Pump Package Installation Manual
Step 4. Install Biotube Pump Package, cont.
Step 4b:
Install the pump and discharge assembly for 4in (100mm)
submersible effluent pumps.
• For HV-style discharge plumbing, see NIN-HV-1,
Plumbing Installation Instructions
• For HDA-style discharge assemblies, see NIN-HDA-1,
Assembly Installation Instructions
Key Points:
• Make sure the pump’s voltage and design gpm or L/sec are correct for the
system.
• Align the discharge assembly and pump vault so the service provider
or operator can easily remove the filter cartridge.
• Hand-tighten all fittings. Don’t use tools to tighten the plumbing
connections and fittings between the pump and the discharge
assembly.
IMPORTANT:
DO NOT lower or raise the pump by the cord! This can
damage the pump!
Step 4c:
Install the float switch assembly. Refer to the following:
• NIN-MF-1,
Float Switch Assembly Installation Instructions
.
• NIN-MF-DA-1,
Float Switch Settings and Adjustments Instructions
IMPORTANT:
DON’T change the float tether lengths.
Step 5. Connect Pump Discharge to Transport/Service Line
Glue the discharge nipple or flex hose stub from the pump package to the
transport/service line.
Step 6. Mount and Wire Control Panel
Key Point:
This step should be performed by a licensed and qualified
electrician.
Note:
Installation instructions, schematics, and wiring diagrams specific
to the panel and float switch configuration are included with each panel.
If any of these are missing, contact your dealer for a replacement.
Step 6a:
Mount the panel using the instructions that came with it.
IMPORTANT:
DO NOT mount the control panel on an exterior wall other
than a garage or shop wall! The motor contactor makes a sound while
engaging and disengaging that can be disruptive to residents.
Key Points:
• Follow all applicable regulations for placement of the control panel.
• Mount the panel in a service-friendly location within sight of the tank.
4b
Pump and HV-style discharge installation
Pump and HV-style discharge installation
6a
Installation Steps
Mount the panel using the instructions that came with it .