background image

Orenco Systems

®

 • 800-348-9843 • +1 541-459-4449 • www.orenco.com 

NIM-EPS-1

Rev. 6 © 10/21

Page 3

Biotube ProPak and LOS Pump Package Installation Manual

Before You Begin, cont.

Check Package Components! 

Be sure that all of the components are included in the pump package before beginning the installation. 

Each Orenco pump package comes with a Biotube pump vault, Biotube effluent filter cartridge, effluent pump, discharge assembly, float 
switch assembly, splice box, and control panel. Be sure you have the necessary risers, lids, lid screws, riser-to-tank adapters, adhesives, 
waterproof wire nuts, and other components required to complete the installation. All of these can be found in Orenco’s Product Catalog, 
which is available from your local distributor, from Orenco, and online at www.orenco.com/products.

Note: 

All pipe diameters given are US nominal IPS pipe sizes. If you’re using metric pipe, you may need adapters to connect to 

the US fittings supplied.

Standard On-Lot Components

1

2

10

10

10

9

9

9

3

6

8

8

7

7

6

4

5

2

1

3

4

5

8

External splice box

7

Discharge assembly (HV-style shown)

9

Access riser

10

Access lid

Control panel not shown

1

Interceptor tank inlet tee

2

Interceptor tank (two-compartment shown)

3

Biotube pump vault

4

Biotube effluent filter cartridge

5

Effluent pump

6

Float switch assembly

Components

Top view (two-compartment concrete tank and HV-style discharge assembly shown; see engineering drawings for project-specific configurations)

Side view (two-compartment concrete tank and HV-style discharge assembly shown; see engineering drawings for project-specific configurations)

Summary of Contents for Biotube ProPak

Page 1: ...Installation Manual 1800348 9843 15414594449 www orenco com Biotube ProPak LOS Pump Package Installation Manual 1 800 348 9843 1 541 459 4449 www orenco com...

Page 2: ...products come with installation instructions and all of these instructions are available in hardcopy form Contact your distributor or Orenco for copies or find instructions online in the Orenco Docume...

Page 3: ...which is available from your local distributor from Orenco and online at www orenco com products Note All pipe diameters given are US nominal IPS pipe sizes If you re using metric pipe you may need a...

Page 4: ...grades are met Step 2 Install Tank Adapters and Risers Step 2a Install the tank adapters if they haven t been installed Follow the manufacturer s instructions For Orenco PRTA24 or PRTA30 Tank Adapter...

Page 5: ...tions to test the seams between the access riser tank adapter and tank for watertightness Key Points Plug the tank s inlet and outlet before testing watertightness Fill the tank with water to a level...

Page 6: ...y Installation Instructions NIN MF DA 1 Float Switch Settings and Adjustments Instructions IMPORTANT DON T change the float tether lengths Step 5 Connect Pump Discharge to Transport Service Line Glue...

Page 7: ...a Open the discharge plumbing valve and service connections Step 7b Unsnap the float switch assembly and remove it from the riser If the assembly includes a Redundant Off Low Level Alarm float switch...

Page 8: ...larm switch in the down position The audible alarm goes silent the panel door alarm light turns off Place the Pump On Off switch in the down position The pump stops running Place the Redundant Off Low...

Page 9: ...the panel door alarm light turns on Timed Dose Y R W or YG R W Float Switch Assemblies MVP S Control Panels Go to the logo unit s input screen per the instructions supplied in the panel Place the Red...

Page 10: ...iser Make sure the coils don t tangle with the float switches Step 8e Place the Auto Off Man switch on the control panel to Auto make sure the control panel circuit breakers are in the On position and...

Page 11: ...Orenco Systems 800 348 9843 1 541 459 4449 www orenco com NIM EPS 1 Rev 6 10 21 Page 11 Biotube ProPak and LOS Pump Package Installation Manual...

Page 12: ...1 800 348 9843 1 541 459 4449 www orenco com NIM EPS 1 Rev 6 10 21 Orenco Systems Installation Manual Biotube ProPak LOS Pump Package...

Reviews: