background image

Installation Manual:

 

AdvanTex

®

 AX20-RT Treatment Units

NIM-ATX-AXRT-1
Rev. 1.0, 1/10

© 2010 Orenco Systems

®

 Inc.

9

Step 7:  Partially Backfill AX20-RT Excavation 

Step 7a: 

Fill the AX20-RT unit with about 16 in. (410 mm) of 

water for internal support. Be sure to fill on both sides of the tank 

baffle. 

Step 7b: 

Backfill around the unit with a 16-in. (410-mm) layer 

of backfill material. Native material is acceptable if there are no 

large or sharp rocks that may damage the unit walls. If native 

material is not usable, backfill with ½-in. aggregate or pea gravel. 

Do not backfill with sand. Use a mechanical compactor to thor-

oughly compact the fill, to minimize settlement and provide sup-

port for the walls of the unit.

Step 7c: 

After the first layer of backfill is complete, fill the tank 

with water to just above the midseam flange on both sides of the 

tank baffle and then add another 16-in. layer of backfill. Compact 

the backfill so that the backfill level is 2-3 in. (50-75 mm) below 

the midseam flange. 

Step 8:  Test Watertightness of AX20-RT Unit

Step 8a: 

After backfilling the AX20-RT excavation to just below 

the midseam flange, make sure that the unit is filled with water 

to at least 1 in. (25 mm) above the midseam flange on both sides 

of the tank baffle.

Step 8b:  

Wait at least 15 minutes and then inspect the midseam 

of the unit for leaks. There should be no drop in liquid level and 

no visible leakage from the seam.

8a

7c

Backfill and compact to 2-3 in. below midseam.

Summary of Contents for AdvanTex AX20-RT

Page 1: ...AdvanTex AX20 RT Treatment Systems An illustrated guide to installing an Orenco AdvanTex AX20 RT Treatment System 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated...

Page 2: ...ew before shipping If this system or any of its components possesses flaws that would inhibit its proper func tioning please contact your authorized AdvanTex Dealer The Dealer can also provide repair...

Page 3: ...sting primary tank must have an at grade access with a securable and removable lid If it doesn t an at grade access must be installed onto the primary tank and be made watertight The primary tank must...

Page 4: ...ayer passes through a Biotube effluent filter and is discharged by gravity to the recirculating treatment tank portion of the AX20 RT unit which contains a Biotube Pump Package The Biotube Pump Packag...

Page 5: ...ans or with plans of limited detail contact your local Dealer or Orenco for design assistance Determine and sketch the exact positions of the primary tank and AX20 RT unit on the site Account for curr...

Page 6: ...emember that you need the correct depth for a consistent slope of 1 8 in per foot 10 mm per meter or 1 from the septic tank outlet to the inlet of the AX20 RT Step 2c Make sure the bottom of the excav...

Page 7: ...m into the riser because structural damage to the tank may occur The inlet and outlet pipe into the tank needs to be turned up or plugged to allow the tank to be filled CAUTION Check the tank manufact...

Page 8: ...the unit is excavated and after a com pacted bed of aggregate or pea gravel if necessary is laid Step 5c Make sure the bottom of the excavation is stable and free of debris especially rocks and other...

Page 9: ...Apply a in 19 mm bead of SS115 or SS140 adhesive down the length of each flange 4 Slide the flanges under the AX20 RT unit and then lower the unit onto the flanges Allow the adhesive to set before mo...

Page 10: ...ill to minimize settlement and provide sup port for the walls of the unit Step 7c After the first layer of backfill is complete fill the tank with water to just above the midseam flange on both sides...

Page 11: ...AX20 RT unit Be sure the vent line is sloped to drain towards the unit and that the passive air vent is within 20 ft 6 m of the unit After installation the top of the passive air vent should be a mini...

Page 12: ...nclude the following items a Incoming power to the panel One or more circuits may be required depending upon the number of pumps and local electrical codes b Incoming phone line to the panel for VeriC...

Page 13: ...isabled Local audible and visual alarms are activated as alarm conditions occur System Data Logs are suspended and Timer cycles are shortened Step 10f Familiarize yourself with the floats on the syste...

Page 14: ...Comm Monitoring System A red LED Modem Activity component should illuminate indicat ing that the controller has established communication with the host This may take a few minutes Once the communicati...

Page 15: ...desired squirt height is not achieved or the unit does not pressurize check for debris breaks or closed valves Also verify that the pump is receiving sufficient power If the unit still does not pressu...

Page 16: ...non cohesive soils with high seasonal water tables use in crushed rock as the backfill material The top of the AX20 RT lid should sit 2 in 50 mm above final grade IMPORTANT After backfilling call the...

Page 17: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc 16 Notes 17...

Page 18: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 17...

Page 19: ...Installation Manual AdvanTex AX20 RT Treatment Units NIM ATX AXRT 1 Rev 1 0 1 10 2010 Orenco Systems Inc Notes 18...

Page 20: ...ystems Residential Applications 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco Systems Incorporated Changing theWay the World DoesWastewater N S F ANSI STANDARD 4 0 NSF AdvanTex Trea...

Reviews: