Assembly step
(
2
)
explosion drawing
8
12
13
15
14
16
18
17
19
21
20
22
9
24
11
10
11
9
9
24
24
24
9
9
24
24
9
23
23
11
10
11
11
No. Description
Note
Qty.
No. Description
Note
Qty.
9
hexagon bolt
M10x75
38
17 tube with hole right
1
10 lock nut
M10
44
18 tube with hole left
1
11 washer
Φ10
88
19 lower plate
4
12 chin up bar
1
20 sliding tube right
1
13 upper plate
4
21 sliding tube left
1
14 pulley frame tube right
1
22 foot tube cover
2
15 pulley frame tube left
1
23 end tube
2
16 upright tube
2
24 hexagon bolt
M10x80
6
Install nuts and bolts hand tight first before
tightening.