Assembly step
(
1
)
explosion drawing
6
8
2
6
4
1
5
3
7
9
10
11
9
9
9
10
9
10
9
9
9
22
22
Install ALL bolts/ nuts before tightening.
Do not over tighten.
No. Description
Note
Qty.
1
connection tube
1
2
upright frame left
1
3
upright frame right
1
4
bending tube left
1
5
bending tube right
1
6
upper connection tube
1
7
upper bending tube
1
8
upper bending tube left
1
9
hexagon bolt
M10*75
16
10 lock nut
M10
16
11 washer
Φ10
32
22 foot tube cover
2