START-UP AND COMMISSIONING 

 

 

Do not operate the gate unless it is completely necessary. Typically the plant (i.e.: waste water treatment plant) has 

not been finished when the  commissioning occurs. Therefore, dust and dirt tends to accumulate on the seals and 
stems. Do not apply extra grease on the seal and/or stem until the construction of the plant has been completely 
finished as it forms a sticky paste with the dust. If the equipment needs to be operated previously wet the seals. 

 

Clean the unit with clear water and make sure there are no foreign deposits or materials on the seals, guides or 

sealing  area.  Use  plastic  tools  to  remove  any  foreign  material  in  order  not  to  contaminate  the  stainless  steel 
equipment. 
Visual Inspection 

 

Verify that all installation instructions defined in the GAD and the IOM manual have been followed. 

 

Verify that the seal is in compression against the logs. Use a 0.5mm (1/32”) gauge. 

 

Embedded In concrete installation: 

o

 

Check  that  the  frame  (or  other  embedded  parts)  has  not  been  distorted  during  installation.  Measure  the 
opening width every 1 meter. The maximum deviation should be +-width/1000. 

o

 

Verify that the frame invert has been embedded in concrete. 

 

Wall mounted at the end of the channel installation. Verify that there are no voids between the concrete wall and 

the back of the frame (open the gate and look on the sides). No light must go through the frame and the wall. Clean 
water can also be used to verify water tightness between the concrete wall and frame. 

 

Face mounted in existing channel installation: 

o

 

Check that the frame has not been distorted during installation. Measure the opening width every 1 meter. 
The maximum deviation should be +-width/1000. 

o

 

Check that the frame has been grouted as indicated in the GAD 

Field Operational Test: 

 

Before cycling the unit, make sure there are no foreign deposits or materials on the seals, guides or sealing area. 

Clean the unit with clear water. Gate seals could be damaged if the area is not cleaned and coated with grease. 
Please refer to Section 7.1 for detailed information. 

 

Seals shall be wetted with clear water before operating the slide gate, and stems and stem nuts shall be greased. 

Field Leakage Test 

 

Close the slide and pressurize the unit at the design water head.  

 

Collect the leaked water during a period of time of 10 minutes (L

T10

 

Calculate the leakage rate: L

R

 (L/min and m) = L

T10

/(10*P), where P is the sealing perimeter in meters. 

 

 

Summary of Contents for ALUMINUM STOP LOG SA

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ALUMINUM STOP LOG SA...

Page 2: ...K TOLERANCES 16 1 INTRODUCTION This manual describes the recommended procedures for installation operation maintenance and safety precautions for the following Orbinox equipment o SA Aluminum Stop Log...

Page 3: ...orbinox com EDITION 12 2017 IOM SA 2 EQUIPMENT MAIN COMPONENTS ITEM DESCRIPTION 1 FRAME 2 LOG 3 VERTICAL SEAL 4 BOTTOM SEAL 5 LATERAL GUIDE 6 LOG LOCKING SYSTEM 7 SEAL AND GUIDE LOCKING SYSTEM 8 INTE...

Page 4: ...eck the equipment on delivery and report back to Orbinox any missing components within 3 days from receipt of the equipment Orbinox will not accept responsibility for loss or damage to any equipment w...

Page 5: ...NEL RECESS Step 1 Initial assessment Check that the concrete wall meets the requirements described in Section 4 Verify that all installation materials specified on the GAD are available Wooden wedges...

Page 6: ...inless steel bolts that secure the vertical guides and seals must be greased on the outside to avoid getting bonded to the concrete Step 2 Anchor the gate to the side of the channel Position the unit...

Page 7: ...www orbinox com EDITION 12 2017 IOM SA CAUTION Make sure not to get grout or any other foreign material on the gate s seals guides or stem as this may cause leakage or damage Figure 6 Figure 7 Figure...

Page 8: ...bolt and prior to drilling the hole on the other side make sure the frame is perfectly leveled Step 3 Construction sealant application Remove the unit from the wall first remove the nuts of the anchor...

Page 9: ...IOM MANUAL SA ALUMINUM STOP LOG www orbinox com EDITION 12 2017 IOM SA Figure 12 Figure 13 Figure 14...

Page 10: ...eter The maximum deviation should be width 1000 o Verify that the frame invert has been embedded in concrete Wall mounted at the end of the channel installation Verify that there are no voids between...

Page 11: ...lide Please refer to section 7 1 for detailed information about the required grease type The following equipment can be used to lift up the gate or logs o Hand pull the slide or logs are equipped with...

Page 12: ...seals and make sure they are not damaged Seals shall be replaced if damaged see section 7 2 Check tightness of all unit assembly bolts and anchor bolts Spare parts Orbinox does not recommend stocking...

Page 13: ...replacement o Step 1 Remove the log from the frame See Figure 15 part 2 o Step 2 Remove the damaged seals and replace it by the new ones See Figure 16 part 1 Add general purspose Loctite to secure the...

Page 14: ...ogs from the frame Remove the Seal and guide Locking System Remove the vertical seals and replace by the new ones For stainless steel frames the seals are secured with stainless steel retainers Secure...

Page 15: ...stall unit repair the concrete wall and re install the unit Insufficient construction sealant refer to the GAD Uninstall the unit clean the concrete wall and apply new construction sealant refer to th...

Page 16: ...mension Deviations shall be within the tolerances defined in DIN 18202 Deviation Maximun deviation Linear deviation DLx DLy DLyy DIN 18202 table 1 group 2 for DLx and DLy DIN 18202 table 1 group 5 for...

Reviews: