Installing a 7x20 Cable Management Arm
Installing a 7x20 Cable Management Arm
Use the following procedure to install the optional cable management arm (CMA) for a 7x20
controller.
This procedure is completed from the back of the equipment rack.
Before You Begin
Unpack the CMA and identify its components.
To prepare for installing the optional cable management arm (CMA), follow these guidelines:
■
Route cluster cables, long-term host cables (including InfiniBand, Fibre Channel, and
Ethernet Cables) and up to 12 disk shelf SAS cables through the CMA.
■
Do not route short SAS daisy chain cables through the CMA. Do not route an excess of
cables such that the CMA clamps bow or appear structurally unfit to support the weight.
164
Oracle ZFS Storage Appliance Installation Guide • December 2016
Summary of Contents for ZS4-4
Page 2: ......
Page 10: ...10 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 98: ...98 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 108: ...108 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 136: ...136 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 154: ...154 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 170: ...170 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 182: ...182 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 210: ...210 Oracle ZFS Storage Appliance Installation Guide December 2016 ...
Page 212: ...212 Oracle ZFS Storage Appliance Installation Guide December 2016 ...