Connecting Cables and Applying Power
This section contains procedures for connecting data management and server management
cables and power cords to the server. The server initial power-on procedure is also described.
■
“Cabling Requirements” on page 57
■
“Back Panel Connectors and Ports” on page 58
■
“Server Management Connection Options” on page 63
■
“Connect Cables and Power Cords” on page 64
■
“Power On the Server” on page 66
Related Information
■
“Installation Procedure Overview” on page 11
■
“Using Oracle Integrated Lights Out Manager (ILOM)” on page 73
Cabling Requirements
Read the following cable requirements for connecting the server.
■
Minimum cable connections for the server:
■
At least one server on-board Ethernet network connection (NET port)
See
■
Serial management port (SER MGT): Service processor (SP) local connection for
Oracle ILOM boot messages
See
.
■
Power cables for the server power supplies
See
“Connect Cables and Power Cords” on page 64
■
SP management ports:
There are two service processor management ports.
Connecting Cables and Applying Power
57
Summary of Contents for X8-8
Page 1: ...Oracle Server X8 8 Installation Guide Part No E93400 02 June 2019 ...
Page 2: ......
Page 10: ...10 Oracle Server X8 8 Installation Guide June 2019 ...
Page 24: ...24 Oracle Server X8 8 Installation Guide June 2019 ...
Page 40: ...40 Oracle Server X8 8 Installation Guide June 2019 ...
Page 72: ...72 Oracle Server X8 8 Installation Guide June 2019 ...
Page 112: ...112 Oracle Server X8 8 Installation Guide June 2019 ...
Page 122: ...122 Oracle Server X8 8 Installation Guide June 2019 ...
Page 134: ...134 Oracle Server X8 8 Installation Guide June 2019 ...