Install the Cable Management Arm
Callout
Description
9
Oracle Server X5-2 (1U)
cable covers
10
Oracle Server X5-2L (2U)
cable covers
2.
Ensure that the correct cable covers for your server are installed on the CMA.
The Oracle Exadata Storage Server X5-2 Extreme Flash (2U system) uses the round cable
covers.
Note -
The CMA ships with three flat cable covers installed. If you are going to install the CMA
on a Oracle Exadata Storage Server X5-2 Extreme Flash, remove the flat cable covers and
install the round cable covers.
3.
Remove the flat cable covers and install the round cable covers.
To remove the flat cable covers and install the round cable covers, perform these steps:
a.
Lift up on the cable cover handle (the handle is colored green) and open
it 180 degrees to the horizontal position as shown in the following figure
[frames 1 and 2].
42
Oracle Exadata Storage Server X5-2 Extreme Flash Installation Guide • July 2018
Summary of Contents for EXADATA X5-2
Page 2: ......
Page 8: ...8 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 24: ...24 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 60: ...60 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 66: ...66 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 70: ...70 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...