background image

Installation Guide    

HDBV3100, HDBV3090, HDBV3080

Installation Guide     

9

For more information, please visit our website at:

http://www.optomausa.com/BigVizion

Step :

Cut a rough opening through the wall at the correct height, so when finished with the standard 2" x 4" wood framing, 
the opening corresponds to the following dimensions:

•  BVHD3100 (100"), the rough wall opening must measure at least: 91-11/16" W x  54-13/16" H.

100" BigVizion Wall Opening Diagram.  (Figure 1-1)

•  BVHD3090 (90"), the rough wall opening must measure at least: 83" W x 50" H.

90" BigVizion Wall Opening Diagram.  (Figure 1-)

•  BVHD3080 (80"), the rough wall opening must measure at least: 74-1/4" W x 45" H.

80" BigVizion Wall Opening Diagram.  (Figure 1-3)

NOTE: The above listed dimensions are suggested minimums, and can be made slightly larger to accommodate 
shim material. 

Wall must be level on all sides. Check with plumb lines and level.

IMPORTANT!

See the next three diagrams of the 100"/90"/80" for detailed dimensions of required wall opening.

Summary of Contents for BigVizion HDBV3100

Page 1: ...HDBV3100 HDBV3090 HDBV3080 Installation Guide...

Page 2: ...system system control components a mirror screen frame assembly and DLP light engine The BigVizion is a modular designed system and offers front access to all components through a movable front screen...

Page 3: ...s the set up and use of Optoma s in wall rear projection displays This manual covers the installation steps in the following order Creating wall openings for BigVizion 100 90 80 Unpacking and identify...

Page 4: ...uipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equ...

Page 5: ...ordinances that may apply to building construction and or modification to residential structures In the event of a conflict regarding any standards governing the installation construction of the BigV...

Page 6: ...I Installation of the Frame Components 1 Shipment of the Internal Frame Components to the Job Site 2 Unpacking the Mirror 3 Installation of the Mirror 4 Unpacking of the Base Unit Components 5 Assembl...

Page 7: ...The BigVizion may be installed during new home construction or aftermarket remodels New home construction lends itself to better placement since the BigVizion could be implemented during the design p...

Page 8: ...e listed steps for installation Wall Preparation Step 1 The location of the installation will be determined by environmental factors such as wall depth lighting and ideal viewing heights The ideal ver...

Page 9: ...16 W x 54 13 16 H 100 BigVizion Wall Opening Diagram Figure 1 1 BVHD3090 90 the rough wall opening must measure at least 83 W x 50 H 90 BigVizion Wall Opening Diagram Figure 1 2 BVHD3080 80 the rough...

Page 10: ...Installation Guide 10 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 1 1 100 BigVizion Wall Opening...

Page 11: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 11 For more information please visit our website at http www optomausa com BigVizion Figure 1 2 90 BigVizion Wall Opening...

Page 12: ...Installation Guide 12 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 1 3 80 BigVizion Wall Opening...

Page 13: ...the installation site during the roughing stage of the construction Step 1 Carefully unpack the master outer frame two vertical and two horizontal pieces See Figure 1 4 Box 1 Detail Notice each piece...

Page 14: ...Installation Guide 14 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 1 4 Box 1 Detail...

Page 15: ...ur website at http www optomausa com BigVizion 4 Assembly of the Master Outer Frame Step 1 Locate the eight 10 32 screws with washers Step 2 Insert two 10 32 screws with washers on each corner to asse...

Page 16: ...Installation Guide 16 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 1 5 Installation of the Master Frame...

Page 17: ...se caution when raising the frame Step 2 Position the frame in the wall opening Step 3 Make certain that the frame is positioned squared and flushed in the wall opening Step 4 Insert the twenty six 8...

Page 18: ...tion Guide 18 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 1 6 Installation of the Master Frame into the Wall...

Page 19: ...ng the Mirror Step 1 Make certain that there are at least three people available for the unpacking and installation of the mirror IMPORTANT The mirror is heavy 150lbs Step 2 Remove the front of the cr...

Page 20: ...nstallation Guide 20 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 2 1 Exploded View of the Mirror and the Fram...

Page 21: ...ther a side opening or a rear opening in the wall behind the master outer frame Slide the shoulder bolt that is on the top left side of the mirror through the slot on the left top of master frame and...

Page 22: ...Installation Guide 22 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 2 2 Installation of the Mirror Assembly...

Page 23: ...ntains the following Two mirror stay arms Two base hangers Two stabilizer arms One projector and component base One projector light hood Two gage alignment blocks Twelve 5 16 18 x 3 4 bolts and nuts S...

Page 24: ...wards the screen wall to the bottom portion of the master outer frame Use two 5 16 18 x 3 4 screws for the left stay arm and the right stay arm Step 9 The curve side of mirror stay arm points up Obser...

Page 25: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 25 For more information please visit our website at http www optomausa com BigVizion Figure 2 3 The Unpacking Diagram...

Page 26: ...Installation Guide 26 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 2 4 Box 2 Detail...

Page 27: ...ure 2 4 Box 2 Detail Step 2 Carefully lift the bottom of the base unit by lifting the left and right side Attach the base hangers as shown in Figure 2 5 Installation of the Projector Base Note the ori...

Page 28: ...with a minimum of two people carefully raise the base unit Step 2 Position the base hangers to the outside of the mirror stay arms Step 3 Insert four 5 16 18 x screws with washers through the two mid...

Page 29: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 29 For more information please visit our website at http www optomausa com BigVizion Figure 2 5 Installation of the Projector Base...

Page 30: ...On the left and right side panel only remove the screws with red washers that secures box 3 to the master crate Step 4 Carefully remove box 3 from the crate and set it aside it is no longer needed Ste...

Page 31: ...d right Step 11 If you are facing the front of the outer master frame it has a hole on the top left side and a slot on the top right side Step 12 With two people lift the screen frame up with the glos...

Page 32: ...Installation Guide 32 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 2 6 Installation of the Screen...

Page 33: ...the bezel Step 1 With two people carefully orient the wood bezel vertically Step 2 Align the six grabber catches the female part of the bezel clip and the male part of the main frame Step 3 Position...

Page 34: ...Installation Guide 34 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 2 7 Installation of the Wood Bezel...

Page 35: ...Video Essentials or Avia Test DVD for alignment patterns Step 1 Using two gage blocks for initial positioning adjust the alignment platform AP until the bottom of AP surface contacts the gage blocks...

Page 36: ...Installation Guide 36 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Figure 3 1 Setting the Gage on 0 Position...

Page 37: ...0 Installation Guide 37 For more information please visit our website at http www optomausa com BigVizion Problem Solution Vertical Keystone Turn knobs 1 4 together in the same direction VERTICAL KEYS...

Page 38: ...se visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Problem Solution Horizontal Keystone Turn knobs 3 4 together in the same direction HORIZONTAL KEY...

Page 39: ...90 HDBV3080 Installation Guide 39 For more information please visit our website at http www optomausa com BigVizion Problem Solution Skewed Image Turn knobs 5 6 in opposite directions SKEWED PICTURE F...

Page 40: ...se visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Problem Solution Image Shift Vertically Turn knobs 5 6 in the same direction IMAGE SHIFT VERTICAL...

Page 41: ...ease visit our website at http www optomausa com BigVizion Problem Solution Image Shift Horizontally Loosen the four Philips head screws just enough to manually shift AP to the left or right and then...

Page 42: ...ormation please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Problem Solution Image Sizing Turn knobs 1 2 3 4 in the same direction IMAGE SIZING...

Page 43: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 43 For more information please visit our website at http www optomausa com BigVizion Appendix A Cable Wiring Connections Cables...

Page 44: ...Installation Guide 44 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Connectors Ballast Cable...

Page 45: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 45 For more information please visit our website at http www optomausa com BigVizion Connectors Continued...

Page 46: ...ight engine 2 Connect Cable 2 from the HDMI slot SC1 on the system command board to the HDMI out slot on the HD3000 3 Connect Cable 3 from the 12V trigger plug SC6 on the system command board to the 1...

Page 47: ...more information please visit our website at http www optomausa com BigVizion System Command Board HDMI 14 pin DVI TS 12V Fan1 Fan2 HD3000 HDMI out 12V L E Bottom LE Power DVI DMD Fan Engine Side TS L...

Page 48: ...arriage Return Command Sequence Basic Protocol Write Receive OK in standby mode Receive OK in normal mode Invalid Command 000 CR 010 CR 001 CR Acknowledgement Basic Protocol Function List Function Des...

Page 49: ...atio 16 19 Aspect Ratio 4 3 Aspect Ratio Native Aspect Ratio Format1 Aspect Ratio Format2 Aspect Ratio Format3 Model ISF Day Model ISF Night Mode User1 Mode User2 Mode User3 Zoom In Zoom Out Shift Up...

Page 50: ...Installation Guide 50 For more information please visit our website at http www optomausa com BigVizion Installation Guide HDBV3100 HDBV3090 HDBV3080 Appendix C Exploded View of the Product...

Page 51: ...Installation Guide HDBV3100 HDBV3090 HDBV3080 Installation Guide 51 For more information please visit our website at http www optomausa com BigVizion...

Page 52: ...Specifications subject to change without notice Copyright 2006 Optoma Technology Inc All rights reserved Canada 5630 Kennedy Road Mississauga ON L4Z 2A9 Tel 905 882 4228 Fax 905 882 4229 www optoma ca...

Reviews: