 Install QT Cartridges

NOTE: Before installing the QT Cartridges, make sure 

to remove the four plugs in the QT heads.

1.  Insert the CTO-Q cartridges into QT heads 1 & 2 

(starting from the left or inlet side of the processor) 

and turn to align arrows.

2.  Insert the AMS-QT membrane cartridge into the 

QT head #3 and turn to align arrows. 

3.  Insert the MA-Q15 mineral cartridge into QT head 

#4 and turn to align arrows. 

4.  Connect the Push-to-Connect elbow (remove plug 

in elbow) on the end of the black Reject tubing to 

the stem connector on the bottom of the AMS-QT 

cartridge.

 System Start-Up

Refer to illustrations “Typical Installation” (page 6) and 

“High Level Switch Testing” (page 20).

IMPORTANT: 

 Before proceeding, position the 

Processor EMERGENCY BYPASS VALVE in the 

“SERVICE” position, assure that the BUFFER TANK 

VALVE is open, and position the TANK INLET DIVERT 

VALVE in the down position (Blue Valve Handle 

pointing sideways).

1.  Slowly open the user-supplied WATER SUPPLY 

VALVE. Plug the processor power cord into a 

120VAC outlet. Allow the filter housings to fill, and 

water will begin to flow from the end of the 1/4” 

black tubing routed to the drain. After some time, 

water will begin to flow into the tank. Allow several 

minutes to flush the system until water flows 

smoothly into the tank and also from the drain line. 

Check all of the plumbing connections and correct 

any leaks if necessary.

2.  Test the high level float switch. With the tank lid 

removed and the system running, raise and tilt the 

high level float (in the tank). As you raise the float 

upward, the ball inside the float will roll from one 

end of the float to the other, activating the switch. 

• With the float in the upright position, the water 

processor should shut off the water flow.

• Lower the float allowing the ball to drop back 

down. The water should begin flowing again.

3.  The 16 Gal Storage Tank must be filled - or the 50 

Gal Storage Tank filled approximately 1/3 of the 

way - to start-up and purge the Repressurization 

Assembly. 

You can quickly fill the storage tank 

to the appropriate level using the “System 

Bypass” on the processor.

 To do this:

•  Route the 1/2” gray hose from the processor 

OPTIMIZED WATER OUTLET TO EQUIPMENT 

directly into the storage tank lid opening.

NOTE: Before performing the next step, be certain 

to hold onto the gray hose.

•  Turn the EMERGENCY BYPASS VALVE on the 

processor to the “BYPASS” position. This will 

allow feed water to bypass the processor and 

quickly fill the storage tank.

• 

When the tank fills to approximately 14 

gallons (or 1/3 full with the 50 gal. tank), 

return the PROCESSOR EMERGENCY 

BYPASS VALVE to the “SERVICE” position

NOTE: Before performing the next step, be certain 

to hold onto the gray hose.

4.  Plug the power cord from the RP pump into the 

outlet. Water should begin to flow rapidly from 

the storage tank, through the RP assembly, 

and back into the storage tank through the gray 

hose. Allow the pump to recirculate the water for 

several minutes until all the air is purged from the 

Repressurization Assembly. As the air is purged, 

the pump will begin to run more smoothly and 

the water flowing from the gray hose will become 

steady.

5.  Unplug the RP Pump cord. 

 Connect to Equipment

Refer to the illustration “Typical Installation” on page 6.

1.  Remove the 1/2” gray hose that was routed 

into the storage tank (from the Optimized Water 

Outlet at the Processor) and make the connection 

to the distribution line that delivers Optimized 

Water to post-treatment (if used) and designated 

equipment.

2.  Ensure that any valves or solenoid valves on the 

connected equipment are closed. Plug the RP 

Pump back in. The pump will run and fill the Buffer 

Tank until the pressure in the Buffer Tank reaches 

70 psi, and then the RP Pump will shut off.

Summary of Contents for BWS350

Page 1: ...m Installation Operation Maintenance Manual Rev 4 Manufactured By OptiPure a Div of AQUION Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS350 iom manual_v3 indd 201...

Page 2: ...Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box Only a...

Page 3: ...Equipment Sample Port 3 8 Push to Connect Used to flush pre filters gather a water sample measure pro duction or drain water from storage tank Blending Valve Allows precise adjustment of optimized wat...

Page 4: ...minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drain line The drain connection should be accessible for system set u...

Page 5: ...ASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS THE 16 GAL TANK 140 LBS ALWAYS LOCATE THE STORAGE TANK WHERE IT CAN BE ACCESSED DURING SERVICE Allow 3 t...

Page 6: ...1 3 2 Processor Tank Repressurization Return Optimized Water to Storage Tank Sample Port Power Cord When installing keep lines from the Repres surization Assembly to the equipment as short as possibl...

Page 7: ...m FEED WATER INLET with the green tubing supplied Hose tubing and fittings for making connections between the processor storage tank and drain are supplied in the installation kit 1 Remove the tank li...

Page 8: ...MIZED WATER TO EQUIPMENT Connect a piece of 1 2 ID gray hose to the OPTIMIZED WATER OUTLET on the processor with a 1 2 hose barb insert and clamp supplied At a later time the other end of this line wi...

Page 9: ...w Lower the float allowing the ball to drop back down The water should begin flowing again 3 The 16 Gal Storage Tank must be filled or the 50 Gal Storage Tank filled approximately 1 3 of the way to st...

Page 10: ...al changes in water quality and municipal source blending practices To assure maintaining your target TDS range year round we recommend periodically checking the IN TDS and making adjustments as neede...

Page 11: ...ly allow the pump to run to open drain with valve fully open to purge air from the pump head Disconnect the power and reconnect several times to facilitate air purging The pump will prime only if all...

Page 12: ...ass Valve PN 520 12230 Solenoid Valve PN 714 10005 Pressure Gauge PN 530 20018 Reject Flow Control PN 514 00440 Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check...

Page 13: ...520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Processor When tank is full float switch is in up positon and switch inside float is open causing Processo...

Page 14: ...quality TDS level Turbidity and specific contaminants such as iron and silica along with water temperature and water pressure The determination of whether to make a Product Reject Flow Rate adjustmen...

Page 15: ...ple Port in 60 seconds To convert ounces per minute to gallons per day multiply ounces mn by 11 25 When finished close the Sample Port valve turn the Tank Inlet Divert Valve to the Down position and o...

Page 16: ...zontal or down 10 Check for leaks 11 Plug in the RP Pump power cord Optional Post treatment cartridge change procedure if applicable 1 Close the ball valve at the inlet to the Post Treatment assembly...

Page 17: ...hes under a preventive maintenance schedule such as annually To restore a Pump with worn brushes order and install Brush Kit 704 39905 which is supplied with instructions Buffer Tank Pre Charge Pressu...

Page 18: ...Relay Allow Processor to partially fill Tank with water Green LED indicates RP Pump is operational will turn on when Buffer Tank is empty Try bumping the RP Pump with your hand If it turns on tempora...

Page 19: ...felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make s...

Reviews: