OptiPure BWS350 Installation, Operation & Maintenance Manual Download Page 2

BWS350 System Installation, Operation & Maintenance 

2

 General Information

Safety Warning

Electrical work should be performed by a qualified 

electrician in  accordance with all applicable 

codes and regulations.

Service Contact  

For local maintenance and service information 

please contact your nearest Authorized Service 

Representative. Service inquiries may be directed 

to technical support at:

 

OptiPure a div. of AQUION, Inc.

 

2605 Technology Dr. Bldg. 300

 

Plano, TX 75074 USA

 

 

Phone #:  972.881.9797

 

Fax #:   972.422.6262  

 

 

E-mail correspondence to: 

 [email protected] 

Environmental Conditions

The BWS350 is certified to operate under the 

following conditions:

1.  Altitude up to 2000 m.

2.  Ambient temperature of 40-105

°F (

5 -  40

°

C).

3.  Max relative humidity 80% at 88

°F (

31

°

C).  

4.  Main supply voltage not to /- 10%.

5.  Installation category II.

6.  Pollution degree II.

7.  Indoor use only, protect from elements. 

Explanation of Symbols 

The following symbols are used on the water 

processor.  The symbols and their explanation is 

given below:

 

  Earth ground:

  WARNING:  Hazardous Voltage:  

 Safety Instructions

1.   Please read and follow these instructions 

when connecting and using the system.

   

2.  To avoid electrical shock, never touch the 

inside of the electrical box.  Only a qualified 

technician should open the electrical box.

3.  Never use the system if the power cord or 

float switch cable has been damaged.  Do not 

allow anything to rest on the power cord or 

float switch cable, and keep the cords away 

from any place where people may trip over 

them.  

4.  When disconnecting from the electric socket 

hold the plug, not the cord. 

5.  If the processor does not function properly, 

especially if there is an unusual sound or 

smell coming from it, immediately unplug 

the processor.  Call your authorized service 

representative. 

6.  Unplug the processor and RP pump from the 

AC outlet prior to any service.

7.  Locate the RP Assembly as close as possible 

to an AC outlet.

8.   Securely bolt processor to wall before 

operating.  

9.  Avoid cross-connections and install on cold 

water supply only.  

10. Use approved Air-Gaps when connecting to 

drain lines.

11. Do not exceed system pressure rating and 

use water hammer arrestors when water 

hammer is evident.

12. Turn off Feed-Water supply before filter or 

membrane cartridge replacement.

Summary of Contents for BWS350

Page 1: ...m Installation Operation Maintenance Manual Rev 4 Manufactured By OptiPure a Div of AQUION Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS350 iom manual_v3 indd 201...

Page 2: ...Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box Only a...

Page 3: ...Equipment Sample Port 3 8 Push to Connect Used to flush pre filters gather a water sample measure pro duction or drain water from storage tank Blending Valve Allows precise adjustment of optimized wat...

Page 4: ...minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drain line The drain connection should be accessible for system set u...

Page 5: ...ASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS THE 16 GAL TANK 140 LBS ALWAYS LOCATE THE STORAGE TANK WHERE IT CAN BE ACCESSED DURING SERVICE Allow 3 t...

Page 6: ...1 3 2 Processor Tank Repressurization Return Optimized Water to Storage Tank Sample Port Power Cord When installing keep lines from the Repres surization Assembly to the equipment as short as possibl...

Page 7: ...m FEED WATER INLET with the green tubing supplied Hose tubing and fittings for making connections between the processor storage tank and drain are supplied in the installation kit 1 Remove the tank li...

Page 8: ...MIZED WATER TO EQUIPMENT Connect a piece of 1 2 ID gray hose to the OPTIMIZED WATER OUTLET on the processor with a 1 2 hose barb insert and clamp supplied At a later time the other end of this line wi...

Page 9: ...w Lower the float allowing the ball to drop back down The water should begin flowing again 3 The 16 Gal Storage Tank must be filled or the 50 Gal Storage Tank filled approximately 1 3 of the way to st...

Page 10: ...al changes in water quality and municipal source blending practices To assure maintaining your target TDS range year round we recommend periodically checking the IN TDS and making adjustments as neede...

Page 11: ...ly allow the pump to run to open drain with valve fully open to purge air from the pump head Disconnect the power and reconnect several times to facilitate air purging The pump will prime only if all...

Page 12: ...ass Valve PN 520 12230 Solenoid Valve PN 714 10005 Pressure Gauge PN 530 20018 Reject Flow Control PN 514 00440 Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check...

Page 13: ...520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Processor When tank is full float switch is in up positon and switch inside float is open causing Processo...

Page 14: ...quality TDS level Turbidity and specific contaminants such as iron and silica along with water temperature and water pressure The determination of whether to make a Product Reject Flow Rate adjustmen...

Page 15: ...ple Port in 60 seconds To convert ounces per minute to gallons per day multiply ounces mn by 11 25 When finished close the Sample Port valve turn the Tank Inlet Divert Valve to the Down position and o...

Page 16: ...zontal or down 10 Check for leaks 11 Plug in the RP Pump power cord Optional Post treatment cartridge change procedure if applicable 1 Close the ball valve at the inlet to the Post Treatment assembly...

Page 17: ...hes under a preventive maintenance schedule such as annually To restore a Pump with worn brushes order and install Brush Kit 704 39905 which is supplied with instructions Buffer Tank Pre Charge Pressu...

Page 18: ...Relay Allow Processor to partially fill Tank with water Green LED indicates RP Pump is operational will turn on when Buffer Tank is empty Try bumping the RP Pump with your hand If it turns on tempora...

Page 19: ...felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make s...

Reviews: