OptiPure BWS350 Installation, Operation & Maintenance Manual Download Page 5

BWS350 System Installation, Operation & Maintenance 

5

 Equipment Dimensions

IMPORTANT - ALLOW A MINIMUM OF 24” IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE.  DO NOT MOUNT 

SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE.  WHEN THE 50 GAL. TANK ASSEMBLY IS 

FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS (THE 16 GAL. TANK, 140 LBS).   ALWAYS LOCATE THE STORAGE TANK 

WHERE IT CAN BE ACCESSED DURING SERVICE.

Allow 3” 

to remove 

cartridges

Processor 

Front View

Processor 

Left Side 

View

Optional 175 Gallon Tank

with Repressurization Pump

50 Gallon Tank  

Repressurization Assembly

16 Gallon Tank Repressurization Assembly

Right Side View

Front View

Summary of Contents for BWS350

Page 1: ...m Installation Operation Maintenance Manual Rev 4 Manufactured By OptiPure a Div of AQUION Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS350 iom manual_v3 indd 201...

Page 2: ...Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box Only a...

Page 3: ...Equipment Sample Port 3 8 Push to Connect Used to flush pre filters gather a water sample measure pro duction or drain water from storage tank Blending Valve Allows precise adjustment of optimized wat...

Page 4: ...minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drain line The drain connection should be accessible for system set u...

Page 5: ...ASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS THE 16 GAL TANK 140 LBS ALWAYS LOCATE THE STORAGE TANK WHERE IT CAN BE ACCESSED DURING SERVICE Allow 3 t...

Page 6: ...1 3 2 Processor Tank Repressurization Return Optimized Water to Storage Tank Sample Port Power Cord When installing keep lines from the Repres surization Assembly to the equipment as short as possibl...

Page 7: ...m FEED WATER INLET with the green tubing supplied Hose tubing and fittings for making connections between the processor storage tank and drain are supplied in the installation kit 1 Remove the tank li...

Page 8: ...MIZED WATER TO EQUIPMENT Connect a piece of 1 2 ID gray hose to the OPTIMIZED WATER OUTLET on the processor with a 1 2 hose barb insert and clamp supplied At a later time the other end of this line wi...

Page 9: ...w Lower the float allowing the ball to drop back down The water should begin flowing again 3 The 16 Gal Storage Tank must be filled or the 50 Gal Storage Tank filled approximately 1 3 of the way to st...

Page 10: ...al changes in water quality and municipal source blending practices To assure maintaining your target TDS range year round we recommend periodically checking the IN TDS and making adjustments as neede...

Page 11: ...ly allow the pump to run to open drain with valve fully open to purge air from the pump head Disconnect the power and reconnect several times to facilitate air purging The pump will prime only if all...

Page 12: ...ass Valve PN 520 12230 Solenoid Valve PN 714 10005 Pressure Gauge PN 530 20018 Reject Flow Control PN 514 00440 Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check...

Page 13: ...520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Processor When tank is full float switch is in up positon and switch inside float is open causing Processo...

Page 14: ...quality TDS level Turbidity and specific contaminants such as iron and silica along with water temperature and water pressure The determination of whether to make a Product Reject Flow Rate adjustmen...

Page 15: ...ple Port in 60 seconds To convert ounces per minute to gallons per day multiply ounces mn by 11 25 When finished close the Sample Port valve turn the Tank Inlet Divert Valve to the Down position and o...

Page 16: ...zontal or down 10 Check for leaks 11 Plug in the RP Pump power cord Optional Post treatment cartridge change procedure if applicable 1 Close the ball valve at the inlet to the Post Treatment assembly...

Page 17: ...hes under a preventive maintenance schedule such as annually To restore a Pump with worn brushes order and install Brush Kit 704 39905 which is supplied with instructions Buffer Tank Pre Charge Pressu...

Page 18: ...Relay Allow Processor to partially fill Tank with water Green LED indicates RP Pump is operational will turn on when Buffer Tank is empty Try bumping the RP Pump with your hand If it turns on tempora...

Page 19: ...felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make s...

Reviews: