OPTICAL SYSTEMS DESIGN
DOC ID: 10109603
OSD2144A OPERATOR MANUAL
PAGE 13
2.2.7
FITTING SFP CONNECTORS
Care should be taken when inserting/removing the SFP connectors from SFP port 3,4 and 5 as SFP
modules are Electrostatic (ES) sensitive and Electrostatic Discharge (ESD) precautions should be taken
when installing. Ensure that the SFP is fully engaged and latched into position.
Inserting SFP
– Ensure that the SFP lever is in the locked position and insert into appropriate SFP
port. Gently push the SFP until it locks into place. Remove plastic/rubber dust cap and fit fiber cable or
RJ45 plug.
Removing SFP
– Remove fiber connector or RJ45 plug. Pull the SFP lever down to unlock SFP from
housing. Using the lever, gently pull the SFP out.
Fiber SFP
Copper SFP
FIGURE 9: FITTING/REMOVING SFP CONNECTORS
Inserting
SFP
Removing
SFP
1
2
Inserting
SFP
Removing
SFP
1
2
Summary of Contents for OSD2144A SERIES
Page 1: ...OPERATOR MANUAL OSD2144A SERIES 5 PORT UNMANAGED GIGABIT ETHERNET SWITCH...
Page 2: ......
Page 17: ......
Page 18: ......
Page 19: ......