O P T E K
D P L - 2 4
11
INSTALLATION (CONTINUED):
10. Supply Compressed Air to input nozzle on right side rear of the machine.
11. Adjust primary regulator to 50-80 PSI.
12. Adjust secondary regulator to 5-10 PSI.
WARNING: DO NOT ATTEMPT TO ADJUST
REGULATOR PAST STOP!!!
DO NOT REMOVE PIN UNDER ANY CIRCUMSTANCES!!!
13. Ensure that switch on pump is in the “OFF” position.
14. Wire and Connect 220 VAC, 3 Phase, 40 Ampere power to input cable.
15. Activate “Main Power” switch on front panel.
16. Momentarily depress “Emergency Reset” switch on front panel.
17. Activate “Vacuum Pump” switch on front panel.
18. With one person at switch and one person at the pump, “JOG” the vacuum
pump switch and monitor the pump to ensure proper rotation indicated by the
arrow found on motor end case.
Note: If the rotation is opposite to that indicated,
reverse any two phases of incoming power.
19. Upon determination of proper pump rotation, leave pump mounted switch in
“`ON” position.
Your DPL-24 unit is now
ready for operation.