background image

SOC-E3N Optical smoke detector with YBN-R/6 socket

2

3

  |  Fire Protection  |  Data sheet No. 40105  | Version 08-2020 

Mounting and electrical connection

All work (such as installation, electrical connection, startup, 
operation, and maintenance) must only be performed by 
sufficiently qualified tradesmen. The respectively applicable 
local rules and regulations (e.g. national building codes, 
electrical/VDE regulations, etc.) must be observed. Installers 
and operating entities are required to sufficiently familiarize 
themselves before startup. Read the product description before 
operating the equipment. Verify that the product can be used 
for the relevant application without restrictions. We are not 
liable for printing errors and changes after printing. Appropriate 
use implies compliance with operating and installation 
instructions. We are not liable for losses due to inappropriate 
use. Unauthorized or inappropriate manipulations or 
modifications of the device render the operating permit,  
the product warranty and warranty claims null and void.

Use dowels and screws to mount the socket on the ceiling 
and route the cable through the center opening. The detector 
locks onto the socket with a bayonet joint. Remove the plastic 
tab from the bottom of the smoke detector before locking the 
detector onto the socket. A tool with a diameter of ca. 3 mm  
is required to dismount the detector.

Wiring diagram for operation with control unit ABAV-S3

Wiring the socket

1

2

5

6

3

4

1

2

5

6

3

4

1

2

5

6

3

4

14 13 12 11

10 9

8

ABAV S3

Control unit

Terminal

resistor

2.2 kOhm 

Max. 30 detectors in total!

Optional

external LED indicator

(12 VDC, 20 mA)

Plastic tab on smoke detector

Unlocking the detector

Reviews: