17
oneida-air.com
Assembly Instructions (Continued)
FIG. 14
FIG. 15
14
Align the Nylon Elbow (F28) on the Cone (B)
with the Nylon Elbow (F29) on the Drum (D).
[FIG. 14] Attach the fully assembled unit onto
the Drum with Lid Clamp (D).
Note: Make sure that the Liner Bag (F41) is
smoothly laid over the edge of the Drum (i.e. no
folds or bunches) before fastening the drum shut
with the Drum Lid Clamp.
15
Install the Clear Vinyl Tubing (F36) onto the
Nylon Elbow (F28) on the Cone (B) with the
Nylon Elbow (F29) on the Drum (D). [FIG.
15]
Note: Push tubing onto elbows until the
connection is firm and tight.
If you did not purchase the Industrial Unit
(#IND), your installation is complete!
F29
F28
F36