Page 9
For technical questions, please call 1-800-444-3353.
Item 69893
Floor Plate Installation Instructions
gravel
ground
Base Plate
(43, 44)
Rear/Side
Floor Plates
(3 – 6)
Front Floor
Plate (1a, 2a)
outside
greenhouse
Cross Section
1. When placing the Floor Plates (1a–6)
on top of the Base Plates (43, 44), align
them as illustrated above. The lip should
extend slightly over the edge of the Base
Plate and the raised flange with bolt holes
should face inside the greenhouse.
2. Place the Front-Left Floor Plate (1a)
on top of the Base Plate (44).
Lay the Front-Right Floor Plate (2a)
next to it.
3. Fasten the Front Floor Plates (1a, 2a)
together using a Floor Plate Bracket (82),
and secure to the Base Plate (44) using
a Hold-down Connector (47) over one of
the Bolts (65), see inset on facing page.
4. Place the Side Floor Plates (4) on
the Side Base Plates (43) on the
front-right and rear-left corners as illustrated.
Lay the Long Side Floor Plates (3)
next to them.
5. Fasten the Side Floor Plates (3, 4) together
using Floor Plate Brackets (82), and secure
to the Base Plates (43) using 3 Hold-
down Connectors (47) on each side of
the greenhouse in the places illustrated;
see illustration and inset on facing page.
6. Lay the Rear-right Floor Plate (6) next
to the Rear-left Floor Plate (5). Fasten
the Rear Floor Plates (5, 6) together
using a Floor Plate Bracket (82).
7. Place the assembled Rear Floor
Plates (5, 6) on top of the Base Plates (44).
8. Secure the Rear Floor Plates (5, 6) to
the Base Plates (44) using 2 Hold-down
Connectors (47) in the locations shown;
see illustration and inset on facing page.
Summary of Contents for 69893
Page 1: ......