background image

Page 10

For technical questions, please call 1-800-444-3353.

Item 69893 

        

47

47

67

67

65

65

7

Phase 3: Corner Post Installation

Parts in this phase 

 

are fastened using 

 

10 

Normal Bolts

 (65)

,  

14 

Brace Bolts

 (66)

,  

Double Brace Bolts

 (78)

 and 26 

Nuts

 (67)

.

(Front)

(Right)

(Rear)

(Left)

5

6

4

3

3

4

1a

2a

7

49

49

49

49

7

7

7

31

31

79

79

79

79

80

80

80

80

a

b

d

c

Floor  Plate

Base  Plate

gravel

Hold-down Connector

 (47) 

 

attachment with Strut

 (79, 80)

a.

 Slide Connector

 (47) under lip.

b.

 Insert Brace Bolt

 (66).

c.

 Slide Strut

 (79, 80) over Bolt.

d.

 Fasten with Nut

 (67)

Grey parts are in place before this phase.

Summary of Contents for 69893

Page 1: ......

Page 2: ...u to potential personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death Indicates a hazardous situation which if not avoided will result in death or s...

Page 3: ...on a flat level surface A concrete foundation is recommended for a high quality installation 9 WARNING The brass bushings inside the Rollers of this product contain lead a chemical known to the State...

Page 4: ...93 Specifications Overall Dimensions 1201 2 W x 1441 2 L x 123 H Window Dimensions 231 4 W x 311 4 L Door Dimensions 751 2 H x 351 2 W x 11 4 Thick Materials Aluminum Frame Transparent Polycarbonate S...

Page 5: ...ure that the greenhouse is properly anchored Harbor Freight Tools cannot be held responsible for personal injury damage to the greenhouse or other property damage that occurs as a result of improperly...

Page 6: ...Page 6 For technical questions please call 1 800 444 3353 Item 69893 Phase 1 Base Assembly All parts in this phase are fastened using 32 Base Bolts 68 and 32 Base Nuts 69...

Page 7: ...Note that the angled edges of the Base Plates 43 44 need to face the corners of the base Use Base Bolts 68 Base Nuts 69 and Connectors 45 46 to secure the pieces together 3 With assistance lower the B...

Page 8: ...parts in this phase are fastened using 38 Normal Bolts 65 38 Nuts 67 and 4 Floor Plate Brackets 82 Front Right Rear Left 47 a b c Floor Plate Base Plate gravel Hold down Connector 47 attachment a Slid...

Page 9: ...Base Plate 44 using a Hold down Connector 47 over one of the Bolts 65 see inset on facing page 4 Place the Side Floor Plates 4 on the Side Base Plates 43 on the front right and rear left corners as i...

Page 10: ...14 Brace Bolts 66 2 Double Brace Bolts 78 and 26 Nuts 67 Front Right Rear Left 5 6 4 3 3 4 1a 2a 7 49 49 49 49 7 7 7 31 31 79 79 79 79 80 80 80 80 a b d c Floor Plate Base Plate gravel Hold down Conn...

Page 11: ...66 and Nut 67 6 Fasten Struts 79 80 to Floor Plates using Brace Bolts 66 Hold down Connectors 47 and Nuts 67 see inset on facing page Allow Rear Braces 31 to hang free 7 Repeat steps 2 through 6 for...

Page 12: ...s 3 Slide the Bolt heads on the Front left Ceiling Plate 24 into the slot of the Right Door Rail 27 from the left edge until it rests against the Front right Ceiling Plate 25 Tighten the 2 right most...

Page 13: ...has 6 holes 2 Place a Long Side Ceiling Plate 13 in the Brackets on the end of the Side Ceiling Plate 12 3 Secure in place with 6 Normal Bolts 65 and 6 Nuts 67 4 Repeat the previous steps for the rem...

Page 14: ...stened using 2 Normal Bolts 65 8 Brace Bolts 66 and 10 Nuts 67 Additional Bolts and Nuts are already in place before this phase Front Right Rear Left 7 7 7 80 80 80 7 13 12 13 12 31 31 80 2 4 2 5 4 8...

Page 15: ...ecure the other end of that Side Ceiling Plate 12 13 similarly 4 Attach the Front Ceiling Plate 24 25 to the 2 Normal Bolts 65 put in place in step 1 on the outside of the greenhouse note orientation...

Page 16: ...x4 14 66 x4 14 66 x4 14 66 78 66 31 31 80 13 12 13 12 14 66 x4 14 66 x4 14 66 x4 14 66 78 66 14 66 78 66 14 66 x4 17 66 x2 16 66 x2 14 66 x4 14 66 78 66 8 1 8 1 8 1 8 1 44 Brace Bolts 66 are inserted...

Page 17: ...t 67 6 Loosen a Bolt on the Rear Floor Plate 5 6 in a location that a Side Post 14 attaches and slide a Side Post over the head of that Bolt Insert 4 Brace Bolts 66 into the slot of that Post 7 View f...

Page 18: ...Bolts 66 and 66 Nuts 67 Additional Bolts and Nuts are already in place before this phase Grey parts are in place before this phase Means that the nearby Bolt will be removed and then re attached at t...

Page 19: ...de Posts but outside Struts as shown in the diagram at the top of this page Note Install the Braces on the walls so that they are level If the frame is level and all Braces are level the Braces should...

Page 20: ...own Installation Parts in this phase are fastened using 42 Normal Bolts 65 42 Nuts 67 1 Straight Bracket 83 and 1 Crown Bracket 84 Additional Bolts and Nuts are already in place before this phase Grey...

Page 21: ...and Left Handed Crown Beams is the location of the holes The Beam edges with 3 drilled holes should align with the Side Ceiling Plate 12 13 and the edges with 4 holes should point down 3 Attach the R...

Page 22: ...bolt head and then it will be re tightened Parts in this phase are fastened using 24 Normal Bolts 65 20 Brace Bolts 66 44 Nuts 67 and 8 Window Screws 71 Additional Bolts and Nuts are already in place...

Page 23: ...ters 3 Make sure the Rafter 15 is completely seated over the Normal Bolts 65 on each end before tightening 4 Repeat above steps for all 10 Rafters 15 5 Connect 4 Side Braces 30 onto the underside of t...

Page 24: ...holes at other end of the Side Window Frames 39 so that the threads stick out the bottom of the window 38 39 65 67 38 39 39 View from underneath window flat side of pieces 65 67 65 65 65 67 3 Remove t...

Page 25: ...Crown 10 11 Slide the top edge of the Top Window Frame 38 into the slot at the top of the Crown 10 11 see illustration to the left Align the window with the Window Brace 41 underneath it Slide the wi...

Page 26: ...0 444 3353 Item 69893 Phase 11 Door Assembly and Installation Profiles exaggerated for clarity 36 36 36 37 33 33 64 64 64 64 70 70 70 70 70 70 70 70 70 70 34 35 top bottom top bottom front back 65 34...

Page 27: ...Attach the Bottom Door Frame 37 to the Side Door Frames 33 using 2 Screws 70 on each side 5 Remove the protective film from both sides of four Door Panels 64 Slide the Door Panels into the door betwe...

Page 28: ...X X X X X X X X X X X X X 55 55 52 52 55 55 55 62 56 57 56 62 52 Outside Greenhouse Inside Greenhouse 55 56 57 62 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X...

Page 29: ...iling and Frame of the Greenhouse Then secure the Transparent Panel in place using the quantity and location of Panel Clips 53 5 To attach Panel Clips see illustration and instructions below A Place t...

Page 30: ...unded to the nearest inch Hardware lengths are approximate Part Description Qty 1a Front Left Floor Plate 5 11 1 2a Front Right Floor Plate 5 11 1 3 Long Side Floor Plate 6 7 2 4 Side Floor Plate 5 3...

Page 31: ...4 57 Front Rear Center Panel 1 11 x 3 6 2 58 Wall Panel 2 x 6 4 12 59 Roof Window Panel 2 x 3 6 4 60 Roof Panel 2 x 6 8 Part Description Qty 61 Window Pane 1 11 x 2 6 4 62 Front Rear Corner Panel 1 1...

Page 32: ...cidental contingent special or consequential damages arising from the use of our product Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limita...

Reviews: