Page 10
For technical questions, please call 1-800-444-3353.
Item 69893
47
47
67
67
65
65
7
Phase 3: Corner Post Installation
Parts in this phase
are fastened using
10
Normal Bolts
(65)
,
14
Brace Bolts
(66)
,
2
Double Brace Bolts
(78)
,
and 26
Nuts
(67)
.
(Front)
(Right)
(Rear)
(Left)
5
6
4
3
3
4
1a
2a
7
49
49
49
49
7
7
7
31
31
79
79
79
79
80
80
80
80
a
b
d
c
Floor Plate
Base Plate
gravel
Hold-down Connector
(47)
attachment with Strut
(79, 80)
a.
Slide Connector
(47) under lip.
b.
Insert Brace Bolt
(66).
c.
Slide Strut
(79, 80) over Bolt.
d.
Fasten with Nut
(67)
Grey parts are in place before this phase.
Summary of Contents for 69893
Page 1: ......