26
3. Operating the UPS
バックアップ
運転
AC入力
バイパス
運転
バッテリ
残量
テスト/ブザー停止
電源出力
異常
接続容量
オーバー
バッテリ
交換
入力15A
オーバー
運転
停止
バックアップ
運転
AC入力
バイパス
運転
バッテリ
残量
テスト/ブザー停止
電源出力
異常
接続容量
オーバー
バッテリ
交換
入力15A
オーバー
運転
停止
Light
is on
Light
is off
Light is on or
off depending
on the status.
<The display showing the state of the stop.>
3-2 Start and stop procedures
●
Start procedure
1. Put the AC Input Plug of the UPS in a wall outlet (commercial power).
After approximately 8 seconds, the AC Input lamp and Battery Indicator lamp goes on and the battery is
being charged.
2. Press and hold the Start switch of the UPS for at least 0.5 second.
A beeper sounds for 0.5 second, and the Bypass Mode Lamp
goes on. During that time, the self-test is performed (approximately
3 seconds). Then the Power Supply Output Lamp go on and
supplying power from the Power Supply Output Receptacle of
the UPS starts. The "Battery indicator" lamp goes on, and "Level
Meter" displays the power consumption in percent of the devices
linked to the UPS.
BU100XR2: 1KVA / 700W as 100%.
BU200XR2: Displayed in 4 levels, taking 2KVA / 1.4KW as 100%.
●
Stop procedure
1. Press and hold the Stop switch of the UPS for at least 2 seconds.
A beeper sounds for 2 seconds, output is stopped, and all the
lamps go out once.
The AC Input Lamp and Battery Indicator Lamp go on again. (The
display shows the same as Step 1 in the start procedure).
* Before starting the initial operation, measure the actual backup time of the UPS in your surroundings.
That gives you a guideline for the battery check.
See also "5-1 Measuring method of the backup time" on page 32.
<The display showing the normal operation>