3-5 Starting the Industrial PC and Procedure after Power Interruption
3-5-2 Operating Sequence for the External Power Supply
3-18
3
Installing th
e NSA-series Industria
l
PC and Con
necting Peripheral Devices
3-5-2 Operating Sequence for the External Power Supply
The following diagram shows the power supply control sequence under normal
operating conditions.
NSA starts up
OS shutdown ends
NSA operating
NSA starts up
Input voltage
held OFF for at
least 10 s.
Do not turn OFF the input
voltage while the NSA is
operating.
External input
NSA built-in power supply
(excluding the 5-Vs auxiliary
power supply)
NSA
OS shutdown begins
10 s min.
Note
•
If the external input voltage is interrupted, it must remain OFF for at least 10 s
before it is turned back ON. (OFF/ON interval: 10 s min.)
•
If the external input voltage is interrupted during any operation, including
shutdown, that operation may not be successfully completed. Shut down the
NSA-series Industrial PC and turn OFF the external 24 V DC input voltage.
The NSA-series Industrial PC does not have UPS or other recovery functions
for power outages or power interruptions. These functions will have to be
provided externally (on the system side).
•
Make sure that the power supply connected to the NSA-series Industrial PC
satisfies the following specifications for NSA-series Industrial PC startup and
power outages.
•
The entire system may shut down depending on how the power is turned ON
or OFF. Follow the correct procedure for turning the power ON and OFF.
Summary of Contents for NSA12-15-TX11B
Page 2: ......
Page 4: ...iv...
Page 6: ...vi...
Page 20: ...xx...
Page 25: ...Section 1 Overview and Specifications...
Page 33: ...Section 2 Nomenclature...
Page 37: ...Section 3 Installing the NSA series Industrial PC and Connecting Peripheral Devices...
Page 59: ...Section 4 RAS Functions...
Page 73: ...Section 5 Maintenance...
Page 81: ...Appendix...
Page 113: ......