
FLOW Service Guide P/N 18982-008 Rev A
5. Replacing Dongles in an EM2100
Step Check Item
Task to be Performed
Check
1
Identify
Dongle ID
In SetNetGo (SNG) go to the license tab. Record the EM2100 FLOW License ID Number.
Include this number when sending C2V to license administrator.
Note
: This step is only
necessary when replacing the EM2100 FLOW License Dongle
□
2
Turn off
EM2100 and
remove
power
Turn off the power on the front panel using the Soft Shutdown procedure specified in the
EM2100 Installation Manual. Turn off the power on the back panel. Unplug power.
□
3
Remove from
rack
If installed in a rack, remove the EM2100 appliance from the rack. To do this pull the EM2100
forward until it is fully extended from track. Press the locking bottons on the side of the rail
and continue to pull until the EM2100 comes out rack. See the EM2100 Installation Guide for
more information.
□
4
Remove the
top panel
Screw size
PH1
4-40
Set the EM2100 appliance on an ESD protected workspace and follow standard ESD
grounding procedures prior to opening the unit. Using the Phillips head screwdriver, remove
the eight screws circled in red on the top of the EM2100. Slide the top back until it stops, lift
and remove the cover. Place cover upright to avoid scratching the top.
□
CAUTION
: Wear an ESD strap