
E5AK/E5CK/E5EK
E5AK/E5CK/E5EK
119
E5EK
Power
board
1.
Remove the Power Board in the order shown in the following
diagram.
2.
Insert the Option Board into the socket for option 1. The
following diagram shows the relationship between the
Option Board and mounting position.
3.
Mount the option boards and the power board in the order
shown.
E5CK
1
2
1.
Two rectangular holes are provided on the Power Board
(right side of Controller). Fit the two protrusions of the
output board into these two holes.
2.
With the output board fitted into the Power Board, fit the
output board into the connector on the control board (left
side of Controller).
Set up the Option Board
1
2
1. Place the bottom of the Controller facing up, fit the board
horizontally into the connector on the power board (right
side of controller).
2. With the Power Board connected, fit the board vertically
into the connector on the control board (left side of
Controller).
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com