![OmniTurn GT-75 Installation, Operations, And Technical Documentation Download Page 14](http://html1.mh-extra.com/html/omniturn/gt-75/gt-75_installation-operations-and-technical-documentation_740716014.webp)
zipldr_setup&operations
www.OmniTurn.com
(541) 332-7004
(541)-332-1018 fax
Fast... Precise... A
ff
ordable...
Zip Loader Setup & Operations
Omni
Turn
Page 14 of 44
Loader Setup and Alignment, Air
Main air for the loader connects to a
bulkhead fitting above the spindle drive
cabinet marked “Loader Air”.
Loader air main regulator should be set
for 90 - 100 psi.
7. Connect Loader Air
System Test, Manual
This test is for your benefit, to verify that nothing broke in shipping.
Perform this test after attaching loader to GT, and before doing any critical alignment of the
hopper and loader. The only alignment requirement is that the pushrod moves freely in the
spindle liner bushing. Do not put any parts in the hopper yet.
Set disconnect on spindle cabinet ON; set CNC control ON. After boot-up, set servos ON.
1. Verify that Auto/Manual keyswitch on Loader Manual Control is in Auto (switch lamps not lit).
2. Verify that green stacklamp is lit.
3. Push loader shuttle against adjustable home stop; verify that “Home” LED is lit.
4. Move the shuttle to “InPlace” sensor; the LED on sensor should light.
5. Move the shuttle to the “ Slow” sensor; the LED on sensor should light.
6. Move the shuttle to “ EoB” sensor ( End of Bar); the LED on sensor should light.
7. Push the shuttle right, until “ Eject” sensor LED lights.
8. Set Auto/Manual keyswitch on Loader Manual Control to Manual; three green push-buttons should light.
9. On knife cylinder, verify that LED on lower sensor is lit.
10. Press “Knife” switch; knife should rise smoothly. On knife cylinder, LED on upper sensor must light (LED
on lower switch should go out). Release switch; knife should fall back.
11. Press “Push” switch; shuttle should move to your right; press “Retract” until shuttle returns to home.
12. Set Auto/Manual switch to Auto. Home the CNC and go to MDI mode.
Front door of GT-75 must be
closed or the door interlock bypass key-switch must be engaged; ziploader cover bypass key-switch on
PLC cabinet must also be engaged.
13. Issue
M40
; knife should rise; issue
M41
; knife should fall.
14. Issue
M45
: rear stop shot-pin and spring-loaded stop piston rod should extend;
M46
to retract.
15. Issue
M56
; red stack-lamp should be lit. (This is a forced loader- fault; useful for reinitializing the loader).
16. Move the shuttle off the home sensor. Press Reset/Initialize switch on loader; shuttle should return to
home and green stack-lamp should be lit. This demonstrates that the PLC ladder is functioning.
This completes the manual system test.