17.
Operation
44
www.sinetech.co.za
This inverter is disabled to generate
power to the load. PV and utility are
charging battery simultaneously due
to insufficient PV power.
This inverter is disabled to generate
power to the load. PV is feeding
power back to the grid.
PV power is sufficient to provide
power to loads and feed power back
to the grid.
PV power and utility are feeding the
load due to insufficient PV power.