Pagina 36 di 45
cod.ITRIP250092D
PRELIMINARY
TRIPARK 25
36
25
Ground anchoring
•
Carry out 2 complete strokes of the lift
•
Check for proper functioning of gears and torsion
bars
•
Return both platforms to the ground
•
Check the perpendicularity between the platforms
and the bases
•
Secure to the ground with all the anchors
TYPE
Q.ty
CHEMICAL ANCHORS
M16X125
5