8. Place of installation
8.1.
Shaft
Choose an adequate installation site large enough to suit the size of the
lift and the chosen hoisting equipment.
The installation site must be fitted with all the plant connections needed
to start up the lift.
To install the anchor capsules, the foundation must have the following
characteristics:
FOUNDATION
Tamped
THICKNESS OF CONCRETE
20 cm
CONCRETE RESISTANCE CLASS
C 25
IMPROVED ADHERENCE STEEL
GIRDERS
Type FeB 44 K
REINFORCEMENT GIRDERS FOR
LARGE SURFACES
Electrowelded mesh
REINFORCEMENT GIRDERS FOR
SMALL SURFACES
Bent irons
FLATNESS
1 / 1000
When the floor characteristics are not avalaible, a suitabel foundation has
to be done below the supporting plates of the platform.
The lift must in any case be fastened to the floor using dedicated
chemical anchor capsules.
MAX PRESSURE ON
THE FOUNDATION
PLATE
Kg/cm
2
1
PROVIDE WATER DRAINAGE AND
IMMERSION PUMP
WORKING TEMPERATURE:
DA -10 A + 40 ° C.