400715D-EN
24
OMAX Preparing for Maintenance
MAXIEM Preparing for Maintenance
video, located at
.
1.
Move the
Z-axis
to the
table
edge.
2.
Clean the work area and make sure there is no abrasive or other debris.
3.
Turn the primary power breaker
OFF
and put a lockout tag on the power disconnect to alert others that
maintenance is in progress.
4.
Close the air and water supply valves.
5.
Bleed the system of remaining pressure.
6.
Put a tray or board under the
Z-axis
to prevent tools and small components from falling into the
catcher
tank
.
Rotate the Mixing Tube
Rotate the mixing tube one-quarter of a turn (90 degrees) every 8 hours of cutting to even the wear and prolong the life
of the mixing tube. Cut a kerf check part, then measure and examine it for dimensional differences.
NOTICE
Handle the nozzle carefully to prevent damage to the abrasive tubing retention tube.
1.
Hold the
nozzle body
to counteract the torque, and loosen the
mixing tube nut
.
Figure 37
2.
Rotate the
mixing tube
clockwise 90 degrees or one-quarter turn.
Figure 38
Summary of Contents for MAXJET 5i 320303 Series
Page 32: ...32 400715D EN...