10
Chapter 3 Preparation and Inspection
MAINTENANCE UNIT MU-1
Prepare the following equipment:
Leakage Testing
Remove water from the Air/Water Channel (For endoscope
with Air/Water channel only)
• Personal Protective Equipment
• Water Container
• Maintenance Unit
(MU-1)
• Endoscope
• Leakage Tester
(MB-155 Optional)
• Water-resistant Cap
(provided with the endoscope,
EVIS Videoscope only)
• Personal Protective Equipment
• Maintenance Unit
(MU-1)
• Endoscope
• AW Channel Cleaning Adapter
(provided with the endoscope)
• Alcohol Container
(only when irrigating with 70% ethyl
or isopropyl alcohol)
(MB-264 Optional)
• 70% ethyl or isopropyl alcohol
(only when irrigating with 70% ethyl
or isopropyl alcohol)
Summary of Contents for MU-1
Page 2: ......
Page 4: ...Contents ii MAINTENANCE UNIT MU 1 Specifications 26...
Page 32: ......
Page 33: ......
Page 34: ......