12
Chapter 3 Preparation and Inspection
MAINTENANCE UNIT MU-1
Installation
Install the Maintenance Unit on the Hook or place the unit on a stable surface in
an area where the unit will not be exposed to the water splashed during
operation. When installing the unit using the feet, confirm that the feet stick firmly
to the installation surface, when attaching the unit to the Hook, confirm that the
screws that attach the Hook to the wall are not loose, and that the Hook does not
move when the unit is attached to it (see Figure 3.1).
Figure 3.1
Connecting the Power Supply
The plug of the power cord that follows the equipment may
vary from this drawing, as in each country the
commercialized cable is in accordance to the local applicable
norm.
1.
Confirm the Power Switch is OFF “
”.
2.
Connect the Power Cord to the Power Cord Receptacle.
3.
Insert the other end of the Power Cord directly into a Wall Mains Outlet (see
Figure 3.2).
Affix Hook to the wall using
fixing screws provided.
Place unit onto Hook ensuring
brackets are full located.
Summary of Contents for MU-1
Page 2: ......
Page 4: ...Contents ii MAINTENANCE UNIT MU 1 Specifications 26...
Page 32: ......
Page 33: ......
Page 34: ......