
DMTA-20006-01EN, Rev. B, February 2014
Index
72
installing
probe 22
protective sleeve 23
sleeve clamp 23
instruction manual 3
instrument compatibility 4
interferences, presence of visual 7
introduction 13
L
labels 1
LEMO/DE-15 connector adaptors 62
link
list, spare parts 58
loom installation tool 20
low-profile phased array probes 14
M
manual
N
NOTE signal word 9
notes, information signal words 9
O
Olympus technical support 11
OmniScan
configuration 13
MX2, interface connector pinout 63
one-sided scanner configuration 17
operating environment specifications 61
operating the scanner 44
P
part numbers
basic kit 57
ordering 52
spare 58
spare, fittings and tubing 57
phantom spots, presence of 7
pinout, OmniScan MX2 scanner interface con-
installing 22
removing 21
replacing 21
specifications 64
probe holder, configuring 31, 39
protective sleeve, installing 23
R
removing
replacing the probe 21
rotating the scanner 45
S
safety
instrument compatibility 7
misuse of instrument 3
precautions 9
signal words 8
symbols 8
scanner
cleaning 47
components 16
exploded view 58
markings, location 1
operating 44
setup chart for larger pipes 66
setup chart for smaller pipes 65
spare parts 58
scanner interface connector, pinout 63
screw driver 20
separating scanner 37
separating the two halves of the scanner 36
serial number 2
setup chart
Summary of Contents for COBRA
Page 6: ...DMTA 20006 01EN Rev B February 2014 List of Abbreviations vi...
Page 18: ...DMTA 20006 01EN Rev B February 2014 Important Information Please Read Before Use 12...
Page 56: ...DMTA 20006 01EN Rev B February 2014 Chapter 3 50...
Page 66: ...DMTA 20006 01EN Rev B February 2014 Chapter 4 60...
Page 76: ...DMTA 20006 01EN Rev B February 2014 List of Tables 70...