
41
BX63
Installing IX-SVL2
1. Place IX-SVL2 over BX63 so that the respective screw numbers (see the figure below) of IX-SVL2 and BX63 are
overlapped.
2. Tighten the screw holes @ and
2
with the clamping screw (attached with IX-SVL2) from the upper side of IX-SVL2. Use
Allen wrench (40x70mm) attached with BX63 for tightening.
3. Tighten the screw holes
3
and
4
with the clamping screw (attached with BX63) from the lower side of the stage fixing
pillar of BX63. Use Allen wrench (28x80mm) attached with BX63 for tightening.
1
1
2
2
3
3
4
4
Clamping screw (attached with IX-SVL2)
}Tighten with Allen wrench (40x70mm).
Clamping screw (attached with BX63)
}Tighten with Allen wrench (28x80mm).
Allen wrench (AxBmm)
A
B
Front side
Front side
Upper side of IX-SVL2
BX63
Lower side of IX-SVL2
Summary of Contents for BX63
Page 55: ......