55.
Fourth row of Battens uses
3H - Roof Batten Short.
Place and attach 13” up from third row of
Battens as per
Steps 52-53
.
13”
13”
13”
56.
Fifth row of Battens uses
3G - Roof Batten Long.
Place and attach 13” up from fourth row of
Battens as per
Steps 50-51
. Be sure to measure from fourth row of Battens and not from the rafter
spacer.
13”
13”
13”
13”
57.
Sixth row of Battens uses
3H - Roof Batten Short.
Place and attach 10 1/2” up from fourth
row of Battens as per
Steps 52-53
. Different Spacing is to accomodate overlap of Metal roof Panels
in
Step 64
. Do not attach yet.
13”
13”
10 1/2”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 29