96”
136 1/2”
Front of Shed
You can find BR1 - Square
Drive Bit for the screws in
with the Hardware Kit Bag.
8.
Make sure Runners are flush with outside
and front and rear floor framing but not
overhanging.
7.
Attach
1F
- Floor Runners
to completed floor frame. There
are 2 floor runners per 136 1/2”
side and 5 completed runners
in total. Use
3 - 2 1/2”
screws
per runner section.
Parts (Steps 7 - 9)
1F - Floor Runners
(1 1/2” x 3 1/2” x 68 3/16”)
x 10
Hardware (Steps 7 - 9)
S1
- 2 1/2” Screws
x 30 total
6.
When completed, your floor footprint
should be 136 1/2” wide x 96” deep.
5.
Complete all large and small
frame attachments. Screw each
completed section together with
8 - 2 1/2”
screws
.
Hardware
S1
- 2 1/2” Screws
x 16 total
4.
Attach each large and small floor joist
frame together with
6 - 2 1/2” screws
per
section.
Hardware
(
S1
- 2 1/2” Screws
) x 18 total
3.
Lay out
1A & 1C -
Floor Joist Frames
as illustrated.
There are 3 larger and 3 smaller Frame Sections. The
Footprint for the floor when attached together will be
136 1/2” wide x 96” deep.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9