Tongue
Groove
Tongue cut off-
(narrow pc.)
will be against
shed.
Groove on
outside.
Groove to
outside.
Slight
recess.
Tight
Edge even with
end of rafter.
71.
Locate
4A - Front Soffit Caps
and
position underneath rafter. Align edge with
rafter seam and tight against wall. Cap
should not extend past end of rafters. Attach
with
3 - 1 1/2” Finishing Nails
. Complete
opposite
side cap now.
Parts
4A - Left/Right Outside Front Soffit Cap
(3/4” x 3” x 14”)
x 2
Hardware
(
N1 - 1 1/2” Finishing Nails
) x 6 total
72.
Locate
4B - Front Soffits
(Tongue & Groove)
&
4C - Front Soffits
(with Tongues cut off). Start by fitting 5 pieces
together (4 wide and 1 narrow) as shown above. Next assemble other
5 pieces the same way.
Parts
4B - Front Soffits
(3/4” x 3 1/2” x 67”)
x 8
4C - Front Soffits
(3/4” x 2 1/4” x 67”)
x 2
73.
Carefully lift one of the front soffit sections and position underneath
rafters tight against soffit cap. Front edge of soffit (grooved edge) should not
extend past end of rafters. Attach with
12 - 1 1/2” Finishing Nails
.
Hardware
N1 - 1 1/2” Finishing Nails
x 12 total
Align with
rafter seam
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 36