38.
Rafter Nailing Cleat
are positioned on the center rafter. Have a helper
lineup
Rafter Nailing Cleat
along the center rafter. Top of
Rafter Nailing Cleat
should be flush with top of the rafter to support plywood roof. Position
Rafter
Nailing Cleat
to be 4 1/4” from each end of rafter as shown below. Pre-drill pilot
holes in the
Rafter Nailing Cleat
and then attach to rafter with
3 - 1 1/4”
screws
. Repeat for each side of the rafter and then on opposite side of the roof
Parts
Rafter Nailing Cleat
(3/4” x 1 1/2” x 48”)
x 4
Hardware
S2
- 1 1/4” Screws
x 12 total
Lineup
Rafter Nailing Cleat
approximately
4 1/4” from end of rafter near soffit.
Lineup
Rafter Nailing Cleat
approximately
4 1/4” from end of rafter near ridge board.
4 1/4”
4 1/4”
Important:
On each
Rafter Nailing Cleat
pre-drill three
pilot holes on the side of the cleat before attaching to cen-
ter rafter to prevent splitting of nailing cleat.