
Hint:
Use a chalk line
to mark location of floor
joists to determine
screw placement.
Front
Important - Make sure floor is
level before moving on to wall
section. Use a level to confirm,
and shim floor joists as required.
12.
With Plywood positioned correctly on
floor framing, attach with
1 1/4” Screws
.
Use screws every 16”.
push plywood
together at seams.
Front
Completed Floor
configuration
11.
Position all
Large
&
Small
Plywood Floor
pieces
on
top of completed floor joists. The Plywood is cut slightly
smaller than Floor framing. Keep Plywood seams tight.
Parts (Steps 11 - 12)
Plywood Floor - Large
(45 3/8” x 74 7/8”)
x 3
Plywood Floor - Small
(45 3/8” x 20 7/8”)
x 3
Hardware (Steps 11 - 12)
S2
- 1 1/4” Screws
x 70 total (approx.)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10