6”
21.
Place and attach (
3B
) Shingle (6” wide) directly on top of Shingle (
3A)
. Shingle (
3B)
will slide
under 2nd row shingle. Secure with
2 - 7/8” Shingle Nails (M)
8” from butt.
6” Wide Shingle (
3B
)
Slide under
1/4” gap
Nail
8”
from
Butt
Nailing
Line
Flush with (
3A)
Shingle
5” Shingle (
3a
)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10
19.
Place
Storage Shelf (2I)
on top of supports and secure with
4 - 1 1/2” Finishing Nails (K).
Complete 2nd Shelf (if desired) as per
Steps 18 & 19.
5”
20.
Lay
Roof Panel (3)
on flat level ground. Note, overhanging Outside Shingles have been removed to avoid
shipping damage and need to be installed. Locate (
3A , 3B & 3C) Shingles
. There are 6 - 5” wide x 16” long
(
3A)
Shingles, 4 - 6” wide x 16” long (
3B)
Shingles and 2 - 6” wide x 12” long (
3C)
Shingles. Position and
attach (
3A)
Shingle (5” wide) on roof panel with
2 - 7/8” Shingle Nails (M)
. See above for details.
16”
long
Roof Panel (
3
)
Outside Shingles
must be installed
Nail 4” from
front of shingle.
1/4” gap
Align Roof
Panel so thick
end of Shingle
(butt end) is
facing front.
See
Step 25
for shingle
layout.
Front
Thin end
Thick end